IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,302

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0407 # 08 Y:2008 08 2008 ELIMINATE LEAKS IN WATER LINES AND VALVES $13,104 $796 Implemented
MI0159 # 01 Y:2008 01 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,617 $120 Implemented
MI0159 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,137 $1,210 Implemented
MI0159 # 03 Y:2008 03 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,615 $3,475 Implemented
MI0159 # 04 Y:2008 04 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,266 $3,978 Implemented
MI0159 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,337 $40 Implemented
MI0159 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,238 $280 Implemented
MI0159 # 07 Y:2008 07 2008 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,875 $120 Not Implemented
MI0159 # 08 Y:2008 08 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,521 $480 Implemented
AM0536 # 01 Y:2008 01 2008 INSULATE BARE EQUIPMENT $26,800 $4,160 Implemented
AM0536 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,000 $230 Implemented
AM0536 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,250 $1,020 Not Implemented
AM0536 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,960 $822 Implemented
AM0536 # 05 Y:2008 05 2008 USE SYNTHETIC LUBRICANT $1,570 $0 Not Implemented
AM0536 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,255 $480 Not Implemented
AM0537 # 01 Y:2008 01 2008 REPLACE BOILER $324,000 $300,000 Not Implemented
AM0537 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $260,000 $750,000 Implemented
AM0537 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,100 $1,500 Implemented
AM0537 # 04 Y:2008 04 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $34,300 $25,000 Not Implemented
AM0537 # 05 Y:2008 05 2008 UPGRADE CONVEYORS $34,150 $80,000 Not Implemented
AM0537 # 06 Y:2008 06 2008 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $18,255 $59,850 Implemented
AM0537 # 07 Y:2008 07 2008 INSULATE BARE EQUIPMENT $15,000 $12,000 Implemented
AM0537 # 08 Y:2008 08 2008 USE SYNTHETIC LUBRICANT $9,930 $0 Implemented
AM0537 # 09 Y:2008 09 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,480 $47,740 Implemented
AM0537 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,150 $1,460 Implemented