IAC logo
IAC Assessment: AM0032
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0032
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1988
Principal Product INSECTICIDES, HERBICIDES
NAICS n/a
SIC 2879 - Agricultural Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 31
Plant Area (Sq.Ft.) 0
Annual Production 1,540 Thousand Gallons
Production Hrs. Annual 8,736
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $119,053 1,936,401 kWh $0.06
Natural Gas $20,200 5,575 MMBtu $3.62
TOTAL ENERGY COSTS $139,253
RECOMMENDED SAVINGS* $9,297 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,804
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$3,735
Cost:
$6,790
- - $3,735 965 -
-
kWh
$3,735
965
MMBtu
02: 2.8112 COMBINE UTILITY METERS Savings:
$1,450
Cost:
$2,000
- - $1,450 - -
-
kWh
$1,450
-
MMBtu
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$115
Cost:
$94
- - $115 34 -
-
kWh
$115
34
MMBtu
04: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$1,193
Cost:
$504
- - $1,193 326 -
-
kWh
$1,193
326
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,096
Cost:
-
$1,096 24,912 - - $1,096
24,912
kWh
-
-
MMBtu
06: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$640
Cost:
-
$640 14,654 - - $640
14,654
kWh
-
-
MMBtu
07: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$671
Cost:
$2,325
$671 15,240 - - $671
15,240
kWh
-
-
MMBtu
08: 2.6232 INSTALL SET-BACK TIMERS Savings:
$325
Cost:
-
$325 5,275 - - $325
5,275
kWh
-
-
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$72
Cost:
$162
$72 879 - - $72
879
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$9,297
Cost:
$11,875
$2,804 60,960 $6,493 1,325 $2,804
60,960
kWh
$6,493
1,325
MMBtu
TOTAL IMPLEMENTED Savings:
$2,804
Cost:
$2,487
$2,804 60,960 - - $2,804
60,960
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas