IAC Assessment: AM0044
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0044
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1988
Principal Product STEEL CASTINGS
NAICS n/a
SIC 3325 - Steel Foundries, Nec
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 0
Annual Production 726 Tons
Production Hrs. Annual 4,096
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $893,000 17,505,862 kWh $0.05
Natural Gas $441,315 159,342 MMBtu $2.77
TOTAL ENERGY COSTS $1,334,315
RECOMMENDED SAVINGS* $184,671 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $126,150
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$119,040
Cost:
-
$119,040 - - - $119,040
-
kWh
-
-
MMBtu
02: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$37,888
Cost:
$68,580
$(-8,960) (-152,403) $46,848 16,731 $(-8,960)
(-152,403)
kWh
$46,848
16,731
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,283
Cost:
$16,500
$9,283 184,642 - - $9,283
184,642
kWh
-
-
MMBtu
04: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$3,950
Cost:
$13,000
$3,950 142,732 - - $3,950
142,732
kWh
-
-
MMBtu
05: 2.5194 REDESIGN PROCESS Savings:
$3,863
Cost:
$2,147
$3,863 139,508 - - $3,863
139,508
kWh
-
-
MMBtu
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,782
Cost:
$3,782
$3,782 77,374 - - $3,782
77,374
kWh
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,500
Cost:
$1,100
$2,500 90,856 - - $2,500
90,856
kWh
-
-
MMBtu
08: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$2,152
Cost:
$1,857
- - $2,152 777 -
-
kWh
$2,152
777
MMBtu
09: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$696
Cost:
$250
$696 24,912 - - $696
24,912
kWh
-
-
MMBtu
10: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$747
Cost:
-
$747 28,722 - - $747
28,722
kWh
-
-
MMBtu
11: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$408
Cost:
-
$408 14,654 - - $408
14,654
kWh
-
-
MMBtu
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$70
Cost:
$64
$70 1,172 - - $70
1,172
kWh
-
-
MMBtu
13: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$292
Cost:
-
$292 10,551 - - $292
10,551
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$184,671
Cost:
$107,280
$135,671 562,720 $49,000 17,508 $135,671
562,720
kWh
$49,000
17,508
MMBtu
TOTAL IMPLEMENTED Savings:
$126,150
Cost:
$3,247
$126,150 259,086 - - $126,150
259,086
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas