IAC Assessment: AM0080
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0080
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1990
Principal Product ROLLING MILL MACHINERY
NAICS n/a
SIC 3547 - Rolling Mill Machinery
Sales $5,000,000-$10,000,000
# of Employees 65
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 4,000
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $103,553 1,694,021 kWh $0.06
Natural Gas $37,182 7,290 MMBtu $5.10
TOTAL ENERGY COSTS $140,735
RECOMMENDED SAVINGS* $22,101 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,501
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$8,290
Cost:
$3,400
$8,290 136,870 - - - - $8,290
136,870
kWh
-
-
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,600
Cost:
$3,500
$3,600 - - - - - $3,600
-
kWh
-
-
MMBtu
-
-
$
03: 4.2310 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
$4,500
Cost:
$3,500
- - - - $4,500 - -
-
kWh
-
-
MMBtu
$4,500
-
$
04: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$4,480
Cost:
-
$4,480 96,424 - - - - $4,480
96,424
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$440
Cost:
$1,010
$440 7,327 - - - - $440
7,327
kWh
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$470
Cost:
$940
$470 9,965 - - - - $470
9,965
kWh
-
-
MMBtu
-
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$172
Cost:
$225
$46 879 $126 25 - - $46
879
kWh
$126
25
MMBtu
-
-
$
08: 2.6122 ADJUST VENTS TO MINIMIZE ENERGY USE Savings:
$149
Cost:
-
$149 3,224 - - - - $149
3,224
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$22,101
Cost:
$12,575
$17,475 254,689 $126 25 $4,500 - $17,475
254,689
kWh
$126
25
MMBtu
$4,500
-
$
TOTAL IMPLEMENTED Savings:
$18,501
Cost:
$9,075
$13,875 254,689 $126 25 $4,500 - $13,875
254,689
kWh
$126
25
MMBtu
$4,500
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes