IAC Assessment: AM0083
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0083
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1990
Principal Product OIL FIELD EQUIPMENT
NAICS n/a
SIC 3533 - Oil And Gas Field Machinery
Sales $10,000,000-$50,000,000
# of Employees 225
Plant Area (Sq.Ft.) 0
Annual Production 40 Pieces
Production Hrs. Annual 2,250
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $269,121 5,092,907 kWh $0.05
Natural Gas $82,011 17,164 MMBtu $4.78
TOTAL ENERGY COSTS $351,132
RECOMMENDED SAVINGS* $36,674 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,144
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$10,970
Cost:
$4,000
$10,970 - - - - - $10,970
-
kWh
-
-
MMBtu
-
-
$
02: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE Savings:
$13,250
Cost:
$4,000
- - - - $13,250 - -
-
kWh
-
-
MMBtu
$13,250
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,560
Cost:
$7,000
$4,560 136,870 - - - - $4,560
136,870
kWh
-
-
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,230
Cost:
$1,300
- - $2,230 467 - - -
-
kWh
$2,230
467
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,150
Cost:
$2,220
$2,050 28,136 - - $100 - $2,050
28,136
kWh
-
-
MMBtu
$100
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,300
Cost:
$4,956
$1,300 17,878 - - - - $1,300
17,878
kWh
-
-
MMBtu
-
-
$
07: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$1,330
Cost:
$2,000
- - $1,330 278 - - -
-
kWh
$1,330
278
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$184
Cost:
$76
$184 879 - - - - $184
879
kWh
-
-
MMBtu
-
-
$
09: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$700
Cost:
$200
$700 13,189 - - - - $700
13,189
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$36,674
Cost:
$25,752
$19,764 196,952 $3,560 745 $13,350 - $19,764
196,952
kWh
$3,560
745
MMBtu
$13,350
-
$
TOTAL IMPLEMENTED Savings:
$33,144
Cost:
$19,496
$18,464 179,074 $1,330 278 $13,350 - $18,464
179,074
kWh
$1,330
278
MMBtu
$13,350
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes