IAC Assessment: AM0092
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0092
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1990
Principal Product FROZEN YOGURT MIXTURE
NAICS n/a
SIC 2023 - Dry, Condensed, Evaporated Products
Sales $100,000,000-$500,000,000
# of Employees 178
Plant Area (Sq.Ft.) 0
Annual Production 16,000 Thousand Gallons
Production Hrs. Annual 4,256
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $660,398 16,060,962 kWh $0.04
Natural Gas $76,422 17,858 MMBtu $4.28
TOTAL ENERGY COSTS $736,820
RECOMMENDED SAVINGS* $13,370 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,372
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$5,963
Cost:
-
$5,963 201,348 - - - - $5,963
201,348
kWh
-
-
MMBtu
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,950
Cost:
$7,000
- - $2,950 690 - - -
-
kWh
$2,950
690
MMBtu
-
-
$
03: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$1,610
Cost:
$30
- - - - $1,610 - -
-
kWh
-
-
MMBtu
$1,610
-
$
04: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$1,153
Cost:
$2,300
$1,153 38,980 - - - - $1,153
38,980
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$225
Cost:
$49
$225 3,517 - - - - $225
3,517
kWh
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$895
Cost:
$3,850
$350 8,792 - - $545 - $350
8,792
kWh
-
-
MMBtu
$545
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$431
Cost:
$860
- - $431 80 - - -
-
kWh
$431
80
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$143
Cost:
$14
$143 3,517 - - - - $143
3,517
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$13,370
Cost:
$14,103
$7,834 256,154 $3,381 770 $2,155 - $7,834
256,154
kWh
$3,381
770
MMBtu
$2,155
-
$
TOTAL IMPLEMENTED Savings:
$8,372
Cost:
$953
$6,331 208,382 $431 80 $1,610 - $6,331
208,382
kWh
$431
80
MMBtu
$1,610
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes