IAC Assessment: AM0095
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0095
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1990
Principal Product FORGINGS,STEEL,TITANIUM
NAICS n/a
SIC 3462 - Iron And Steel Forgings
Sales $10,000,000-$50,000,000
# of Employees 235
Plant Area (Sq.Ft.) 0
Annual Production 1,500 Tons
Production Hrs. Annual 8,736
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $262,384 5,255,569 kWh $0.05
Natural Gas $985,430 521,932 MMBtu $1.89
TOTAL ENERGY COSTS $1,247,814
RECOMMENDED SAVINGS* $140,320 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$75,970
Cost:
$37,000
- - $75,970 40,220 -
-
kWh
$75,970
40,220
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$43,400
Cost:
$101,400
$(-13,200) (-278,429) $56,600 29,970 $(-13,200)
(-278,429)
kWh
$56,600
29,970
MMBtu
03: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$9,335
Cost:
$17,000
- - $9,335 4,935 -
-
kWh
$9,335
4,935
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,505
Cost:
$600
$3,505 109,613 - - $3,505
109,613
kWh
-
-
MMBtu
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,745
Cost:
$7,875
$2,745 - - - $2,745
-
kWh
-
-
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,256
Cost:
$4,050
- - $2,256 1,193 -
-
kWh
$2,256
1,193
MMBtu
08: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,760
Cost:
-
$1,760 55,100 - - $1,760
55,100
kWh
-
-
MMBtu
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,185
Cost:
$425
$1,185 36,928 - - $1,185
36,928
kWh
-
-
MMBtu
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$164
Cost:
$60
$164 2,345 - - $164
2,345
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$140,320
Cost:
$168,410
$(-3,841) (-74,443) $144,161 76,318 $(-3,841)
(-74,443)
kWh
$144,161
76,318
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas