Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1991
Principal Product AIRCRAFT GROUND POWER
NAICS n/a
SIC 3537 - Industrial Trucks And Tractors
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 0
Annual Production 400 Pieces
Production Hrs. Annual 2,780
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $106,867 1,640,680 kWh $0.07
Natural Gas $13,043 2,644 MMBtu $4.93
TOTAL ENERGY COSTS $119,910
RECOMMENDED SAVINGS* $21,336 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,000
Cost:
-
$6,800 87,925 $1,200 - $6,800
87,925
kWh
$1,200
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$7,950
Cost:
$215
$7,950 167,057 - - $7,950
167,057
kWh
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,506
Cost:
-
$753 9,965 $753 - $753
9,965
kWh
$753
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,250
Cost:
-
$1,250 26,377 - - $1,250
26,377
kWh
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,050
Cost:
$1,960
$1,050 - - - $1,050
-
kWh
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$650
Cost:
$680
$650 13,775 - - $650
13,775
kWh
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$640
Cost:
$50
$640 13,482 - - $640
13,482
kWh
-
-
$
08: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$290
Cost:
$350
$290 6,155 - - $290
6,155
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$21,336
Cost:
$3,255
$19,383 324,736 $1,953 - $19,383
324,736
kWh
$1,953
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
$
Savings
Cost
$ kWh $ $