IAC Assessment: AM0122
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0122
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1991
Principal Product HARDWOOD LUMBER
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 34
Plant Area (Sq.Ft.) 0
Annual Production 10,000 Thousand Feet
Production Hrs. Annual 8,736
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $100,991 2,068,288 kWh $0.05
Wood $55,579 90,200 MMBtu $0.62
TOTAL ENERGY COSTS $156,570
RECOMMENDED SAVINGS* $5,274 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,771
#|Description Savings
Cost
Status Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,156
Cost:
$748
$1,156 31,360 - - - - $1,156
31,360
kWh
-
-
MMBtu
-
-
$
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,500
Cost:
-
$1,500 14,654 - - - - $1,500
14,654
kWh
-
-
MMBtu
-
-
$
03: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$1,350
Cost:
-
$1,350 37,808 - - - - $1,350
37,808
kWh
-
-
MMBtu
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$540
Cost:
$1,270
- - $540 880 - - -
-
kWh
$540
880
MMBtu
-
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$503
Cost:
-
- - - - $503 - -
-
kWh
-
-
MMBtu
$503
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$55
Cost:
$14
$55 586 - - - - $55
586
kWh
-
-
MMBtu
-
-
$
07: 2.6232 INSTALL SET-BACK TIMERS Savings:
$170
Cost:
-
$170 5,569 - - - - $170
5,569
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$5,274
Cost:
$2,032
$4,231 89,977 $540 880 $503 - $4,231
89,977
kWh
$540
880
MMBtu
$503
-
$
TOTAL IMPLEMENTED Savings:
$4,771
Cost:
$2,032
$4,231 89,977 $540 880 - - $4,231
89,977
kWh
$540
880
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes