IAC logo
IAC Assessment: AM0136
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0136
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1992
Principal Product WOODEN CABINETS
NAICS n/a
SIC 2434 - Wood Kitchen Cabinets
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 0
Annual Production 60,000 Pieces
Production Hrs. Annual 2,176
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,930 996,483 kWh $0.07
Natural Gas $7,730 1,545 MMBtu $5.00
TOTAL ENERGY COSTS $81,660
RECOMMENDED SAVINGS* $24,006 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,036
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$19,590
Cost:
-
$19,590 - - - - - $19,590
-
kWh
-
-
MMBtu
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$746
Cost:
$580
$746 8,499 - - - - $746
8,499
kWh
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,430
Cost:
$420
$1,430 28,722 - - - - $1,430
28,722
kWh
-
-
MMBtu
-
-
$
04: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$840
Cost:
-
$840 9,379 - - - - $840
9,379
kWh
-
-
MMBtu
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$610
Cost:
$2,300
- - $610 123 - - -
-
kWh
$610
123
MMBtu
-
-
$
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$520
Cost:
-
$520 10,551 - - - - $520
10,551
kWh
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$30
Cost:
-
$65 879 - - $(-35) - $65
879
kWh
-
-
MMBtu
$(-35)
-
$
08: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$240
Cost:
-
$240 4,982 - - - - $240
4,982
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$24,006
Cost:
$3,300
$23,431 63,012 $610 123 $(-35) - $23,431
63,012
kWh
$610
123
MMBtu
$(-35)
-
$
TOTAL IMPLEMENTED Savings:
$22,036
Cost:
$1,000
$22,071 43,082 - - $(-35) - $22,071
43,082
kWh
-
-
MMBtu
$(-35)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes