IAC logo
IAC Assessment: AM0150
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0150
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1992
Principal Product GROUND HAM AND BEEF
NAICS n/a
SIC 2013 - Sausages And Other Prepared Meats
Sales $10,000,000-$50,000,000
# of Employees 14
Plant Area (Sq.Ft.) 0
Annual Production 5,260,000 Pounds
Production Hrs. Annual 4,572
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $71,341 1,348,183 kWh $0.05
Natural Gas $28,691 7,822 MMBtu $3.67
TOTAL ENERGY COSTS $100,032
RECOMMENDED SAVINGS* $5,619 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,131
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,480
Cost:
$110
$1,480 49,824 - - - - $1,480
49,824
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$990
Cost:
$1,290
$990 14,947 - - - - $990
14,947
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$115
Cost:
-
$216 4,982 - - $(-101) - $216
4,982
kWh
-
-
MMBtu
$(-101)
-
$
04: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$640
Cost:
$3,000
- - $640 208 - - -
-
kWh
$640
208
MMBtu
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$483
Cost:
$360
- - $483 157 - - -
-
kWh
$483
157
MMBtu
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$410
Cost:
$110
$410 7,913 - - - - $410
7,913
kWh
-
-
MMBtu
-
-
$
07: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$363
Cost:
-
$363 7,620 - - - - $363
7,620
kWh
-
-
MMBtu
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$230
Cost:
-
$230 3,517 - - - - $230
3,517
kWh
-
-
MMBtu
-
-
$
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$468
Cost:
$348
$468 8,792 - - - - $468
8,792
kWh
-
-
MMBtu
-
-
$
10: 2.2511 INSULATE BARE EQUIPMENT Savings:
$160
Cost:
$300
$160 4,103 - - - - $160
4,103
kWh
-
-
MMBtu
-
-
$
11: 2.8112 COMBINE UTILITY METERS Savings:
$150
Cost:
$110
- - $150 - - - -
-
kWh
$150
-
MMBtu
-
-
$
12: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$130
Cost:
$50
$130 2,638 - - - - $130
2,638
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$5,619
Cost:
$5,678
$4,447 104,336 $1,273 365 $(-101) - $4,447
104,336
kWh
$1,273
365
MMBtu
$(-101)
-
$
TOTAL IMPLEMENTED Savings:
$4,131
Cost:
$2,220
$3,749 92,027 $483 157 $(-101) - $3,749
92,027
kWh
$483
157
MMBtu
$(-101)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes