IAC Assessment: AM0157
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0157
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1992
Principal Product STEEL FORGINGS
NAICS n/a
SIC 3462 - Iron And Steel Forgings
Sales $1,000,000-$5,000,000
# of Employees 260
Plant Area (Sq.Ft.) 0
Annual Production 24,600,000 Pounds
Production Hrs. Annual 6,024
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $283,804 4,036,929 kWh $0.07
Natural Gas $719,204 276,098 MMBtu $2.60
TOTAL ENERGY COSTS $1,003,008
RECOMMENDED SAVINGS* $161,985 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $161,985
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE Savings:
$67,280
Cost:
$2,250
- - $67,280 25,850 -
-
kWh
$67,280
25,850
MMBtu
02: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$37,400
Cost:
$53,200
- - $37,400 14,400 -
-
kWh
$37,400
14,400
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$32,285
Cost:
$96,000
- - $32,285 12,315 -
-
kWh
$32,285
12,315
MMBtu
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$13,410
Cost:
-
$13,410 - - - $13,410
-
kWh
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,180
Cost:
$630
$9,180 213,658 - - $9,180
213,658
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,470
Cost:
$4,080
$1,470 19,930 - - $1,470
19,930
kWh
-
-
MMBtu
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$960
Cost:
-
$960 22,274 - - $960
22,274
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$161,985
Cost:
$156,160
$25,020 255,862 $136,965 52,565 $25,020
255,862
kWh
$136,965
52,565
MMBtu
TOTAL IMPLEMENTED Savings:
$161,985
Cost:
$156,160
$25,020 255,862 $136,965 52,565 $25,020
255,862
kWh
$136,965
52,565
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas