IAC logo
IAC Assessment: AM0186
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0186
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1993
Principal Product petroleum drilling drill bits
NAICS n/a
SIC 3533 - Oil And Gas Field Machinery
Sales $50,000,000-$100,000,000
# of Employees 400
Plant Area (Sq.Ft.) 215,500
Annual Production 21,000 Pieces
Production Hrs. Annual 5,322
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,299,446 26,932,591 kWh $0.05
Natural Gas $208,486 67,192 MMBtu $3.10
TOTAL ENERGY COSTS $1,507,932
RECOMMENDED SAVINGS* $353,410 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $41,130
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$272,040
Cost:
$100,000
$272,040 2,705,158 - - $272,040
2,705,158
kWh
-
-
MMBtu
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$33,670
Cost:
-
- - $33,670 11,370 -
-
kWh
$33,670
11,370
MMBtu
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$17,400
Cost:
$68,000
$17,400 - - - $17,400
-
kWh
-
-
MMBtu
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$17,300
Cost:
-
$17,300 - - - $17,300
-
kWh
-
-
MMBtu
05: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$7,460
Cost:
-
$7,460 240,328 - - $7,460
240,328
kWh
-
-
MMBtu
06: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$5,540
Cost:
$2,000
$5,540 178,781 - - $5,540
178,781
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$353,410
Cost:
$170,000
$319,740 3,124,267 $33,670 11,370 $319,740
3,124,267
kWh
$33,670
11,370
MMBtu
TOTAL IMPLEMENTED Savings:
$41,130
Cost:
-
$7,460 240,328 $33,670 11,370 $7,460
240,328
kWh
$33,670
11,370
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas