IAC logo
IAC Assessment: AM0191
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0191
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1993
Principal Product ornamental and wood burning fire places
NAICS n/a
SIC 3433 - Heating Equipment, Except Electric
Sales $10,000,000-$50,000,000
# of Employees 145
Plant Area (Sq.Ft.) 0
Annual Production 46,253 Pieces
Production Hrs. Annual 5,448
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $123,543 1,686,108 kWh $0.07
Natural Gas $5,664 1,321 MMBtu $4.29
TOTAL ENERGY COSTS $129,207
RECOMMENDED SAVINGS* $43,570 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,920
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,900
Cost:
$2,300
$11,900 339,977 - - $11,900
339,977
kWh
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,800
Cost:
$3,200
$10,800 150,938 - - $10,800
150,938
kWh
-
-
$
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$10,200
Cost:
$4,100
$10,200 - - - $10,200
-
kWh
-
-
$
04: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$8,650
Cost:
$3,680
$8,650 246,190 - - $8,650
246,190
kWh
-
-
$
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$750
Cost:
-
$750 20,516 - - $750
20,516
kWh
-
-
$
06: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$700
Cost:
-
- - $700 - -
-
kWh
$700
-
$
07: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$570
Cost:
-
$570 16,120 - - $570
16,120
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$43,570
Cost:
$13,280
$42,870 773,741 $700 - $42,870
773,741
kWh
$700
-
$
TOTAL IMPLEMENTED Savings:
$34,920
Cost:
$9,600
$34,220 527,551 $700 - $34,220
527,551
kWh