IAC Assessment: AM0239
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0239
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1995
Principal Product Recycling and densifying of plastics into granules
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 30
Plant Area (Sq.Ft.) 60,125
Annual Production 11,750 Tons
Production Hrs. Annual 6,384
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $153,215 1,747,655 kWh $0.09
LPG $18,626 2,440 MMBtu $7.63
TOTAL ENERGY COSTS $171,841
RECOMMENDED SAVINGS* $39,805 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,315
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$13,240
Cost:
-
$13,240 - - - $13,240
-
kWh
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$19,120
Cost:
$23,550
$19,120 - - - $19,120
-
kWh
-
-
$
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$3,680
Cost:
-
$3,680 70,926 - - $3,680
70,926
kWh
-
-
$
04: 2.7145 INSTALL SKYLIGHTS Savings:
$1,180
Cost:
$2,550
$1,180 22,860 - - $1,180
22,860
kWh
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$920
Cost:
$170
$920 10,258 - - $920
10,258
kWh
-
-
$
06: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$753
Cost:
-
- - $753 - -
-
kWh
$753
-
$
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$532
Cost:
$29
$532 7,327 - - $532
7,327
kWh
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$230
Cost:
$328
$230 4,396 - - $230
4,396
kWh
-
-
$
09: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$150
Cost:
-
$150 1,758 - - $150
1,758
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$39,805
Cost:
$26,627
$39,052 117,525 $753 - $39,052
117,525
kWh
$753
-
$
TOTAL IMPLEMENTED Savings:
$24,315
Cost:
$23,907
$23,562 82,649 $753 - $23,562
82,649
kWh
$753
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes