Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 1995 |
Principal Product | Welded steel tube, fabricated steel line pipe and mechanical |
NAICS | n/a |
SIC | 3317 - Steel Pipe And Tubes |
Sales | $10,000,000-$50,000,000 |
# of Employees | 116 |
Plant Area (Sq.Ft.) | 160,000 |
Annual Production | 63,000 Tons |
Production Hrs. Annual | 6,048 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $692,210 | 17,924,971 | kWh | $0.04 |
TOTAL ENERGY COSTS | $692,210 | |||
RECOMMENDED SAVINGS* | $57,880 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $13,300 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #2 | Other Liquid (non-haz) | Other Liquid (haz) | Solid Waste (non-haz) | Electricity Usage | Fuel Oil #2 | Other Liquid (non-haz) | Other Liquid (haz) | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | $ | gal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS |
Savings: $20,880 Cost: $69,400 |
$27,100 | - | $(-6,220) | (-726) | - | - | - | - | - | - |
$27,100 - kWh |
$(-6,220) (-726) MMBtu |
- - gal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $21,630 Cost: - |
$21,630 | - | - | - | - | - | - | - | - | - |
$21,630 - kWh |
- - MMBtu |
- - gal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,100 Cost: $800 |
$2,100 | 90,270 | - | - | - | - | - | - | - | - |
$2,100 90,270 kWh |
- - MMBtu |
- - gal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $1,680 Cost: - |
$1,680 | 56,272 | - | - | - | - | - | - | - | - |
$1,680 56,272 kWh |
- - MMBtu |
- - gal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $390 Cost: $690 |
$390 | 11,137 | - | - | - | - | - | - | - | - |
$390 11,137 kWh |
- - MMBtu |
- - gal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT |
Savings: $7,450 Cost: $7,900 |
- | - | - | - | - | - | - | - | $7,450 | 64,000 |
- - kWh |
- - MMBtu |
- - gal |
- - gal |
$7,450 64,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.7131 USE A RAG RECYCLE SERVICE |
Savings: $2,000 Cost: - |
- | - | - | - | - | - | - | - | $2,000 | 13,000 |
- - kWh |
- - MMBtu |
- - gal |
- - gal |
$2,000 13,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.8211 CONVERT TO AQUEOUS CLEANING SYSTEM |
Savings: $1,060 Cost: $3,600 |
- | - | - | - | - | - | $1,060 | 324 | - | - |
- - kWh |
- - MMBtu |
- - gal |
$1,060 324 gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $560 Cost: - |
- | - | - | - | $560 | - | - | - | - | - |
- - kWh |
- - MMBtu |
$560 - gal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $130 Cost: - |
- | - | - | - | - | - | - | - | $130 | - |
- - kWh |
- - MMBtu |
- - gal |
- - gal |
$130 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $57,880 Cost: $82,390 |
$52,900 | 157,679 | $(-6,220) | (-726) | $560 | - | $1,060 | 324 | $9,580 | 77,000 | $52,900 157,679 kWh |
$(-6,220) (-726) MMBtu |
$560 - gal |
$1,060 324 gal |
$9,580 77,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $13,300 Cost: $12,300 |
$2,100 | 90,270 | - | - | $560 | - | $1,060 | 324 | $9,580 | 77,000 | $2,100 90,270 kWh |
- - MMBtu |
$560 - gal |
$1,060 324 gal |
$9,580 77,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | $ | gal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #2 | Other Liquid (non-haz) | Other Liquid (haz) | Solid Waste (non-haz) | Electricity Usage | Fuel Oil #2 | Other Liquid (non-haz) | Other Liquid (haz) | Solid Waste (non-haz) |