Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 1995 |
Principal Product | Aluminum die castings |
NAICS | n/a |
SIC | 3363 - Aluminum Die-castings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 425 |
Plant Area (Sq.Ft.) | 142,000 |
Annual Production | 12,000,000 Pounds |
Production Hrs. Annual | 6,696 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $365,653 | 6,837,632 | kWh | $0.05 |
Natural Gas | $226,957 | 77,212 | MMBtu | $2.94 |
TOTAL ENERGY COSTS | $592,610 | |||
RECOMMENDED SAVINGS* | $131,810 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $45,910 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | Electricity Usage | Natural Gas | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | gal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $12,350 Cost: $580 |
- | - | $12,350 | 4,200 | - | - | - | - | - | - |
- - kWh |
$12,350 4,200 MMBtu |
- - Tgal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,560 Cost: $750 |
$5,560 | 213,951 | - | - | - | - | - | - | - | - |
$5,560 213,951 kWh |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,340 Cost: $60 |
$1,340 | 27,550 | - | - | - | - | - | - | - | - |
$1,340 27,550 kWh |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,560 Cost: $240 |
$1,560 | 30,774 | - | - | - | - | - | - | - | - |
$1,560 30,774 kWh |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $1,220 Cost: - |
$1,220 | 24,912 | - | - | - | - | - | - | - | - |
$1,220 24,912 kWh |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,140 Cost: $3,300 |
$1,140 | 23,740 | - | - | - | - | - | - | - | - |
$1,140 23,740 kWh |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7145 INSTALL SKYLIGHTS |
Savings: $500 Cost: $1,250 |
$500 | 19,637 | - | - | - | - | - | - | - | - |
$500 19,637 kWh |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7145 INSTALL SKYLIGHTS |
Savings: $300 Cost: $1,200 |
$300 | 11,430 | - | - | - | - | - | - | - | - |
$300 11,430 kWh |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.1172 REVISE RAW MATERIAL SPECS |
Savings: $82,700 Cost: $30,200 |
- | - | - | - | - | - | $82,700 | 72,400 | - | - |
- - kWh |
- - MMBtu |
- - Tgal |
$82,700 72,400 gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES |
Savings: $17,300 Cost: - |
- | - | - | - | $17,300 | 2,330,000 | - | - | - | - |
- - kWh |
- - MMBtu |
$17,300 2,330,000 Tgal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS |
Savings: $7,840 Cost: $1,200 |
- | - | - | - | - | - | - | - | $7,840 | 272,000 |
- - kWh |
- - MMBtu |
- - Tgal |
- - gal |
$7,840 272,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $131,810 Cost: $38,780 |
$11,620 | 351,994 | $12,350 | 4,200 | $17,300 | 2,330,000 | $82,700 | 72,400 | $7,840 | 272,000 | $11,620 351,994 kWh |
$12,350 4,200 MMBtu |
$17,300 2,330,000 Tgal |
$82,700 72,400 gal |
$7,840 272,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $45,910 Cost: $3,790 |
$8,420 | 277,843 | $12,350 | 4,200 | $17,300 | 2,330,000 | - | - | $7,840 | 272,000 | $8,420 277,843 kWh |
$12,350 4,200 MMBtu |
$17,300 2,330,000 Tgal |
- - gal |
$7,840 272,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | gal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) | Electricity Usage | Natural Gas | Water Disposal | Other Liquid (non-haz) | Solid Waste (non-haz) |