IAC Assessment: AM0264
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0264
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1996
Principal Product School furniture, including dorm and lab furniture
NAICS n/a
SIC 2531 - Public Building & Related Furniture
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 327,000
Annual Production 13,326 Pieces
Production Hrs. Annual 1,992
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $59,067 1,180,832 kWh $0.05
Electricity Demand $52,821 6,486 kW-months/year $8.14
Natural Gas $18,063 4,343 MMBtu $4.16
TOTAL ENERGY COSTS $563,697
RECOMMENDED SAVINGS* $48,740 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,165
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,660
Cost:
$510
$2,660 65,651 - - - - - - $2,660
65,651
kWh
-
-
kW-months/year
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$735
Cost:
$1,230
$185 4,689 $60 6 - - $490 - $185
4,689
kWh
$60
6
kW-months/year
-
-
lb
$490
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$575
Cost:
$40
$225 5,569 $350 34 - - - - $225
5,569
kWh
$350
34
kW-months/year
-
-
lb
-
-
$
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$500
Cost:
-
$500 12,309 - - - - - - $500
12,309
kWh
-
-
kW-months/year
-
-
lb
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$150
Cost:
$150
$70 1,758 $80 8 - - - - $70
1,758
kWh
$80
8
kW-months/year
-
-
lb
-
-
$
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$44,120
Cost:
$960
- - - - $44,120 172,260 - - -
-
kWh
-
-
kW-months/year
$44,120
172,260
lb
-
-
$
TOTAL RECOMMENDED Savings:
$48,740
Cost:
$2,890
$3,640 89,976 $490 48 $44,120 172,260 $490 - $3,640
89,976
kWh
$490
48
kW-months/year
$44,120
172,260
lb
$490
-
$
TOTAL IMPLEMENTED Savings:
$48,165
Cost:
$2,850
$3,415 84,407 $140 14 $44,120 172,260 $490 - $3,415
84,407
kWh
$140
14
kW-months/year
$44,120
172,260
lb
$490
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes