IAC logo
IAC Assessment: AM0268
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0268
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1996
Principal Product Titanium & inconel aircraft engine components
NAICS n/a
SIC 3724 - Aircraft Engines And Engine Parts
Sales $10,000,000-$50,000,000
# of Employees 128
Plant Area (Sq.Ft.) 120,000
Annual Production 600 Pieces
Production Hrs. Annual 5,134
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $420,896 10,061,548 kWh $0.04
Electricity Demand $47,449 28,584 kW-months/year $1.66
Natural Gas $30,856 10,405 MMBtu $2.97
TOTAL ENERGY COSTS $499,201
RECOMMENDED SAVINGS* $39,594 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,854
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ Tgal $ lb $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$28,900
Cost:
-
$28,900 688,746 - - - - - - - - $28,900
688,746
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,295
Cost:
$1,070
$280 6,741 $15 9 - - - - $3,000 - $280
6,741
kWh
$15
9
kW-months/year
-
-
Tgal
-
-
lb
$3,000
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,290
Cost:
$700
$1,290 30,774 - - - - - - - - $1,290
30,774
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$860
Cost:
$1,160
$710 16,706 $150 90 - - - - - - $710
16,706
kWh
$150
90
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$694
Cost:
$520
$650 15,533 $44 26 - - - - - - $650
15,533
kWh
$44
26
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
06: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$740
Cost:
-
$700 14,947 $40 24 - - - - - - $700
14,947
kWh
$40
24
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
07: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$2,230
Cost:
$500
- - - - $2,230 - - - - - -
-
kWh
-
-
kW-months/year
$2,230
-
Tgal
-
-
lb
-
-
$
08: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$905
Cost:
$110
- - - - - - $905 1,885 - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$905
1,885
lb
-
-
$
09: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$680
Cost:
-
- - - - - - $680 1,226 - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$680
1,226
lb
-
-
$
TOTAL RECOMMENDED Savings:
$39,594
Cost:
$4,060
$32,530 773,447 $249 149 $2,230 - $1,585 3,111 $3,000 - $32,530
773,447
kWh
$249
149
kW-months/year
$2,230
-
Tgal
$1,585
3,111
lb
$3,000
-
$
TOTAL IMPLEMENTED Savings:
$38,854
Cost:
$4,060
$31,830 758,500 $209 125 $2,230 - $1,585 3,111 $3,000 - $31,830
758,500
kWh
$209
125
kW-months/year
$2,230
-
Tgal
$1,585
3,111
lb
$3,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Administrative Changes