IAC logo
IAC Assessment: AM0279
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0279
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1996
Principal Product Business forms
NAICS n/a
SIC 2761 - Manifold Business Forms
Sales $10,000,000-$50,000,000
# of Employees 113
Plant Area (Sq.Ft.) 65,000
Annual Production 20,370,000 Pounds
Production Hrs. Annual 6,416
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $90,616 3,042,790 kWh $0.03
Electricity Demand $60,574 7,080 kW-months/year $8.56
Electricity Fees $5,804 - $ -
Natural Gas $1,777 319 MMBtu $5.57
TOTAL ENERGY COSTS $158,771
RECOMMENDED SAVINGS* $5,991 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,611
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ $ $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,780
Cost:
$530
$150 4,982 $60 7 - - - - $1,570 - $150
4,982
kWh
$60
7
kW-months/year
-
-
$
-
-
lb
$1,570
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$950
Cost:
$490
$560 18,464 $390 46 - - - - - - $560
18,464
kWh
$390
46
kW-months/year
-
-
$
-
-
lb
-
-
$
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$790
Cost:
-
$460 15,240 $330 39 - - - - - - $460
15,240
kWh
$330
39
kW-months/year
-
-
$
-
-
lb
-
-
$
04: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$636
Cost:
-
- - - - $636 - - - - - -
-
kWh
-
-
kW-months/year
$636
-
$
-
-
lb
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$590
Cost:
$20
$390 13,189 $200 24 - - - - - - $390
13,189
kWh
$200
24
kW-months/year
-
-
$
-
-
lb
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$560
Cost:
$200
$560 18,757 - - - - - - - - $560
18,757
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$425
Cost:
-
$280 9,086 $145 17 - - - - - - $280
9,086
kWh
$145
17
kW-months/year
-
-
$
-
-
lb
-
-
$
08: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$260
Cost:
$110
- - - - - - $260 1,230 - - -
-
kWh
-
-
kW-months/year
-
-
$
$260
1,230
lb
-
-
$
TOTAL RECOMMENDED Savings:
$5,991
Cost:
$1,350
$2,400 79,718 $1,125 133 $636 - $260 1,230 $1,570 - $2,400
79,718
kWh
$1,125
133
kW-months/year
$636
-
$
$260
1,230
lb
$1,570
-
$
TOTAL IMPLEMENTED Savings:
$4,611
Cost:
$1,330
$1,550 51,289 $595 70 $636 - $260 1,230 $1,570 - $1,550
51,289
kWh
$595
70
kW-months/year
$636
-
$
$260
1,230
lb
$1,570
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes