IAC Assessment: AM0302
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0302
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1997
Principal Product blowers and fans
NAICS n/a
SIC 3564 - Blowers And Fans
Sales $1,000,000-$5,000,000
# of Employees 35
Plant Area (Sq.Ft.) 31,780
Annual Production 63,250 Pieces
Production Hrs. Annual 2,598
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $27,671 643,611 kWh $0.04
Electricity Demand $27,255 4,292 kW-months/year $6.35
Natural Gas $3,153 670 MMBtu $4.71
TOTAL ENERGY COSTS $153,479
RECOMMENDED SAVINGS* $7,920 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,240
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Other Liquid (haz) Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ gal $ gal $ lb $ $
01: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$4,080
Cost:
$295
- - - - - - - - $4,080 2,400 - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
gal
$4,080
2,400
lb
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$800
Cost:
-
$340 7,913 $460 73 - - - - - - - - $340
7,913
kWh
$460
73
kW-months/year
-
-
gal
-
-
gal
-
-
lb
-
-
$
03: 4.231 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
$610
Cost:
-
- - - - - - - - - - $610 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
gal
-
-
lb
$610
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$540
Cost:
$300
$540 12,603 - - - - - - - - - - $540
12,603
kWh
-
-
kW-months/year
-
-
gal
-
-
gal
-
-
lb
-
-
$
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$520
Cost:
-
$520 12,016 - - - - - - - - - - $520
12,016
kWh
-
-
kW-months/year
-
-
gal
-
-
gal
-
-
lb
-
-
$
06: 3.7131 USE A RAG RECYCLE SERVICE Savings:
$470
Cost:
$33
- - - - - - - - - - $470 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
gal
-
-
lb
$470
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$220
Cost:
-
- - - - - - - - $220 15,000 - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
gal
$220
15,000
lb
-
-
$
08: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$210
Cost:
-
$210 4,689 - - - - - - - - - - $210
4,689
kWh
-
-
kW-months/year
-
-
gal
-
-
gal
-
-
lb
-
-
$
09: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$180
Cost:
-
$180 4,103 - - - - - - - - - - $180
4,103
kWh
-
-
kW-months/year
-
-
gal
-
-
gal
-
-
lb
-
-
$
10: 3.8133 CONVERT TO AQUEOUS CLEANING Savings:
$150
Cost:
-
- - - - $(-220) (-330) $370 660 - - - - -
-
kWh
-
-
kW-months/year
$(-220)
(-330)
gal
$370
660
gal
-
-
lb
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$140
Cost:
$70
$80 1,758 $60 9 - - - - - - - - $80
1,758
kWh
$60
9
kW-months/year
-
-
gal
-
-
gal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$7,920
Cost:
$698
$1,870 43,082 $520 82 $(-220) (-330) $370 660 $4,300 17,400 $1,080 - $1,870
43,082
kWh
$520
82
kW-months/year
$(-220)
(-330)
gal
$370
660
gal
$4,300
17,400
lb
$1,080
-
$
TOTAL IMPLEMENTED Savings:
$6,240
Cost:
$595
$1,090 25,205 $460 73 - - - - $4,080 2,400 $610 - $1,090
25,205
kWh
$460
73
kW-months/year
-
-
gal
-
-
gal
$4,080
2,400
lb
$610
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ gal $ lb $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Other Liquid (haz) Solid Waste (non-haz) Administrative Changes