IAC logo
IAC Assessment: AM0306
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0306
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1997
Principal Product Clay coated paperboard, gravure preprinted corrugated paperb
NAICS n/a
SIC 2631 - Paperboard Mills
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 486,000
Annual Production 55,000 Thousand Feet
Production Hrs. Annual 5,946
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $376,438 11,630,715 kWh $0.03
Electricity Demand $202,650 24,099 kW-months/year $8.41
Electricity Fees $8,783 - $ -
TOTAL ENERGY COSTS $652,771
RECOMMENDED SAVINGS* $132,605 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $118,590
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ Tgal $ lb
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$83,400
Cost:
-
- - $83,400 6,588 - - - - - - -
-
kWh
$83,400
6,588
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
02: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$27,210
Cost:
$747
- - - - - - - - $27,210 19,230 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
$27,210
19,230
lb
03: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$8,495
Cost:
-
- - - - $8,495 - - - - - -
-
kWh
-
-
kW-months/year
$8,495
-
$
-
-
Tgal
-
-
lb
04: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$2,800
Cost:
$1,115
$(-125) (-4,689) $(-145) (-11) - - $3,070 12,250,100 - - $(-125)
(-4,689)
kWh
$(-145)
(-11)
kW-months/year
-
-
$
$3,070
12,250,100
Tgal
-
-
lb
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,750
Cost:
-
- - $2,750 217 - - - - - - -
-
kWh
$2,750
217
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
06: 2.7145 INSTALL SKYLIGHTS Savings:
$2,090
Cost:
$4,310
$2,090 77,374 - - - - - - - - $2,090
77,374
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$830
Cost:
-
- - - - - - - - $830 51,780 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
$830
51,780
lb
08: 2.7145 INSTALL SKYLIGHTS Savings:
$1,740
Cost:
$5,350
$1,740 64,185 - - - - - - - - $1,740
64,185
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
09: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,400
Cost:
$100
$550 20,223 $850 67 - - - - - - $550
20,223
kWh
$850
67
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
10: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$910
Cost:
$80
$420 15,533 $490 39 - - - - - - $420
15,533
kWh
$490
39
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$680
Cost:
$340
$180 6,741 $500 40 - - - - - - $180
6,741
kWh
$500
40
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
12: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$300
Cost:
-
- - - - - - - - $300 1,400 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
$300
1,400
lb
TOTAL RECOMMENDED Savings:
$132,605
Cost:
$12,042
$4,855 179,367 $87,845 6,940 $8,495 - $3,070 12,250,100 $28,340 72,410 $4,855
179,367
kWh
$87,845
6,940
kW-months/year
$8,495
-
$
$3,070
12,250,100
Tgal
$28,340
72,410
lb
TOTAL IMPLEMENTED Savings:
$118,590
Cost:
$7,392
$2,585 95,252 $84,595 6,683 - - $3,070 12,250,100 $28,340 72,410 $2,585
95,252
kWh
$84,595
6,683
kW-months/year
-
-
$
$3,070
12,250,100
Tgal
$28,340
72,410
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ Tgal $ lb