IAC logo
IAC Assessment: AM0327
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0327
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1998
Principal Product Plastic compounding, electrical non-metallic tubing and cond
NAICS n/a
SIC 3087 - Custom Compound Purchased Resins
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 45,000
Annual Production 173,000,000 Pounds
Production Hrs. Annual 8,568
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $337,033 9,291,325 kWh $0.04
Electricity Demand $119,116 18,861 kW-months/year $6.32
Electricity Fees $8,443 - $ -
TOTAL ENERGY COSTS $483,552
RECOMMENDED SAVINGS* $20,790 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,330
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Water Disposal Electricity Usage Electricity Demand Electricity Fees Water Disposal
$ kWh $ kW-months/year $ $ $ Tgal
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,420
Cost:
-
$2,420 100,821 $3,000 246 - - - - $2,420
100,821
kWh
$3,000
246
kW-months/year
-
-
$
-
-
Tgal
02: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$4,490
Cost:
-
- - - - $4,490 - - - -
-
kWh
-
-
kW-months/year
$4,490
-
$
-
-
Tgal
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,260
Cost:
$860
$2,650 110,492 $1,610 132 - - - - $2,650
110,492
kWh
$1,610
132
kW-months/year
-
-
$
-
-
Tgal
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,510
Cost:
$2,070
$850 35,463 $660 54 - - - - $850
35,463
kWh
$660
54
kW-months/year
-
-
$
-
-
Tgal
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,380
Cost:
-
- - $1,380 113 - - - - -
-
kWh
$1,380
113
kW-months/year
-
-
$
-
-
Tgal
06: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$1,160
Cost:
$210
- - - - - - $1,160 614,100 -
-
kWh
-
-
kW-months/year
-
-
$
$1,160
614,100
Tgal
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,080
Cost:
-
$600 24,912 $480 40 - - - - $600
24,912
kWh
$480
40
kW-months/year
-
-
$
-
-
Tgal
08: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$770
Cost:
$1,700
$770 31,946 - - - - - - $770
31,946
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$720
Cost:
$250
$720 29,894 - - - - - - $720
29,894
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$20,790
Cost:
$5,090
$8,010 333,528 $7,130 585 $4,490 - $1,160 614,100 $8,010
333,528
kWh
$7,130
585
kW-months/year
$4,490
-
$
$1,160
614,100
Tgal
TOTAL IMPLEMENTED Savings:
$18,330
Cost:
$5,090
$7,410 308,616 $5,270 432 $4,490 - $1,160 614,100 $7,410
308,616
kWh
$5,270
432
kW-months/year
$4,490
-
$
$1,160
614,100
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ Tgal
Electricity Usage Electricity Demand Electricity Fees Water Disposal Electricity Usage Electricity Demand Electricity Fees Water Disposal