IAC logo
IAC Assessment: AM0356
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0356
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1999
Principal Product fabricated steel parts
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 94,000
Annual Production 6,000,000 Pounds
Production Hrs. Annual 4,348
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $92,711 1,816,237 kWh $0.05
Electricity Demand $9,043 7,337 kW-months/year $1.23
Natural Gas $7,930 1,862 MMBtu $4.26
TOTAL ENERGY COSTS $109,684
RECOMMENDED SAVINGS* $62,495 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,555
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz)
$ kWh $ kW-months/year $ gal $ lb
01: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$24,660
Cost:
-
- - - - $24,660 8,380 - - -
-
kWh
-
-
kW-months/year
$24,660
8,380
gal
-
-
lb
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$12,500
Cost:
-
- - $12,500 2,413 - - - - -
-
kWh
$12,500
2,413
kW-months/year
-
-
gal
-
-
lb
03: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$8,260
Cost:
-
- - - - - - $8,260 40,000 -
-
kWh
-
-
kW-months/year
-
-
gal
$8,260
40,000
lb
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,710
Cost:
$18,100
- - $5,710 2,083 - - - - -
-
kWh
$5,710
2,083
kW-months/year
-
-
gal
-
-
lb
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,570
Cost:
$1,500
$3,570 111,665 - - - - - - $3,570
111,665
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,790
Cost:
$5,000
- - - - - - $2,790 11,700 -
-
kWh
-
-
kW-months/year
-
-
gal
$2,790
11,700
lb
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,960
Cost:
$150
$1,030 35,463 $930 125 - - - - $1,030
35,463
kWh
$930
125
kW-months/year
-
-
gal
-
-
lb
08: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,950
Cost:
$5,500
- - $1,950 775 - - - - -
-
kWh
$1,950
775
kW-months/year
-
-
gal
-
-
lb
09: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$730
Cost:
-
$730 22,860 - - - - - - $730
22,860
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$365
Cost:
$940
$175 5,569 $190 26 - - - - $175
5,569
kWh
$190
26
kW-months/year
-
-
gal
-
-
lb
TOTAL RECOMMENDED Savings:
$62,495
Cost:
$31,190
$5,505 175,557 $21,280 5,422 $24,660 8,380 $11,050 51,700 $5,505
175,557
kWh
$21,280
5,422
kW-months/year
$24,660
8,380
gal
$11,050
51,700
lb
TOTAL IMPLEMENTED Savings:
$13,555
Cost:
$26,190
$4,775 152,697 $8,780 3,009 - - - - $4,775
152,697
kWh
$8,780
3,009
kW-months/year
-
-
gal
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb
Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz)