IAC Assessment: AM0359
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0359
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1999
Principal Product Injection molded plastic pails
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 107
Plant Area (Sq.Ft.) 135,000
Annual Production 27,100,000 Pounds
Production Hrs. Annual 8,568
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $408,495 14,352,286 kWh $0.03
Electricity Demand $152,647 23,943 kW-months/year $6.38
Natural Gas $6,231 1,849 MMBtu $3.37
TOTAL ENERGY COSTS $567,373
RECOMMENDED SAVINGS* $24,861 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,475
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$7,930
Cost:
$1,340
$6,040 211,899 $1,890 297 - - - - - - $6,040
211,899
kWh
$1,890
297
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$4,270
Cost:
-
- - $4,270 672 - - - - - - -
-
kWh
$4,270
672
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$3,430
Cost:
$100
- - - - - - $3,430 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$3,430
-
$
-
-
$
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$3,120
Cost:
-
$3,120 109,320 - - - - - - - - $3,120
109,320
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 2.7145 INSTALL SKYLIGHTS Savings:
$1,840
Cost:
$4,000
$1,840 64,771 - - - - - - - - $1,840
64,771
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,350
Cost:
$560
$1,030 36,342 $320 51 - - - - - - $1,030
36,342
kWh
$320
51
kW-months/year
-
-
lb
-
-
$
-
-
$
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,426
Cost:
$384
$1,810 63,599 - - - - $(-384) - - - $1,810
63,599
kWh
-
-
kW-months/year
-
-
lb
$(-384)
-
$
-
-
$
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$700
Cost:
-
- - - - $700 20,000 - - - - -
-
kWh
-
-
kW-months/year
$700
20,000
lb
-
-
$
-
-
$
09: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$340
Cost:
$26
$340 12,016 - - - - - - - - $340
12,016
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
10: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$235
Cost:
-
- - - - - - - - $235 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$235
-
$
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$220
Cost:
$90
$220 7,913 - - - - - - - - $220
7,913
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$24,861
Cost:
$6,500
$14,400 505,860 $6,480 1,020 $700 20,000 $3,046 - $235 - $14,400
505,860
kWh
$6,480
1,020
kW-months/year
$700
20,000
lb
$3,046
-
$
$235
-
$
TOTAL IMPLEMENTED Savings:
$18,475
Cost:
$2,116
$7,630 268,170 $6,480 1,020 $700 20,000 $3,430 - $235 - $7,630
268,170
kWh
$6,480
1,020
kW-months/year
$700
20,000
lb
$3,430
-
$
$235
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes