IAC Assessment: AM0370
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0370
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2000
Principal Product Steel forgings
NAICS n/a
SIC 3462 - Iron And Steel Forgings
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 181,400
Annual Production 100,000,000 Pounds
Production Hrs. Annual 5,886
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,543,029 72,773,448 kWh $0.02
Electricity Fees $38,478 - $ -
Natural Gas $180,644 51,423 MMBtu $3.51
TOTAL ENERGY COSTS $1,797,151
RECOMMENDED SAVINGS* $366,795 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $57,190
#|Description Savings
Cost
Status Electricity Usage Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product Electricity Usage Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product
$ kWh $ gal $ lb $ $ $ $ $ $
01: 4.4530 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION Savings:
$222,000
Cost:
-
- - - - - - $222,000 - - - - - -
-
kWh
-
-
gal
-
-
lb
$222,000
-
$
-
-
$
-
-
$
02: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$48,780
Cost:
$500
- - - - - - $48,780 - - - - - -
-
kWh
-
-
gal
-
-
lb
$48,780
-
$
-
-
$
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$19,700
Cost:
$74,740
$19,700 849,941 - - - - - - - - - - $19,700
849,941
kWh
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
04: 3.7214 REDUCE OR ELIMINATE WASTE Savings:
$17,500
Cost:
$2,120
- - $17,500 47,250 - - - - - - - - -
-
kWh
$17,500
47,250
gal
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$26,200
Cost:
$2,200
$26,200 1,230,950 - - - - - - - - - - $26,200
1,230,950
kWh
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,950
Cost:
$500
$6,950 330,891 - - - - - - - - - - $6,950
330,891
kWh
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
07: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$6,870
Cost:
-
- - - - - - - - $6,870 - - - -
-
kWh
-
-
gal
-
-
lb
-
-
$
$6,870
-
$
-
-
$
08: 4.1250 Savings:
$5,390
Cost:
-
- - - - - - - - - - $5,390 - -
-
kWh
-
-
gal
-
-
lb
-
-
$
-
-
$
$5,390
-
$
09: 2.7145 INSTALL SKYLIGHTS Savings:
$4,700
Cost:
$3,520
$4,700 222,450 - - - - - - - - - - $4,700
222,450
kWh
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
10: 2.7145 INSTALL SKYLIGHTS Savings:
$3,500
Cost:
$13,900
$3,500 167,937 - - - - - - - - - - $3,500
167,937
kWh
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
11: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$4,425
Cost:
$20
- - - - $4,425 31,200 - - - - - - -
-
kWh
-
-
gal
$4,425
31,200
lb
-
-
$
-
-
$
-
-
$
12: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$675
Cost:
$150
- - - - $675 18,750 - - - - - - -
-
kWh
-
-
gal
$675
18,750
lb
-
-
$
-
-
$
-
-
$
13: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$105
Cost:
-
$105 4,982 - - - - - - - - - - $105
4,982
kWh
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$366,795
Cost:
$97,650
$61,155 2,807,151 $17,500 47,250 $5,100 49,950 $270,780 - $6,870 - $5,390 - $61,155
2,807,151
kWh
$17,500
47,250
gal
$5,100
49,950
lb
$270,780
-
$
$6,870
-
$
$5,390
-
$
TOTAL IMPLEMENTED Savings:
$57,190
Cost:
$77,510
$26,755 1,185,814 $17,500 47,250 $675 18,750 - - $6,870 - $5,390 - $26,755
1,185,814
kWh
$17,500
47,250
gal
$675
18,750
lb
-
-
$
$6,870
-
$
$5,390
-
$
Savings
Cost
$ kWh $ gal $ lb $ $ $ $ $ $
Electricity Usage Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product Electricity Usage Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product