Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2000
Principal Product Milk products
NAICS n/a
SIC 2026 - Fluid Milk
Sales $50,000,000-$100,000,000
# of Employees 240
Plant Area (Sq.Ft.) 120,000
Annual Production 30,000 Thousand Gallons
Production Hrs. Annual 6,816
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $346,302 14,045,135 kWh $0.02
Electricity Demand $172,466 23,986 kW-months/year $7.19
Natural Gas $75,502 22,087 MMBtu $3.42
TOTAL ENERGY COSTS $777,296
RECOMMENDED SAVINGS* $31,605 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,545
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 3.4151 MINIMIZE WATER USAGE Savings:
$13,250
Cost:
$3,170
- - - - - - $13,250 4,090,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$13,250
4,090,000
Tgal
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$6,590
Cost:
$500
- - - - $6,590 1,925 - - - - -
-
kWh
-
-
kW-months/year
$6,590
1,925
MMBtu
-
-
Tgal
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,500
Cost:
$10,990
- - $5,500 752 - - - - - - -
-
kWh
$5,500
752
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$2,180
Cost:
$300
- - - - - - $2,180 1,295 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,180
1,295
Tgal
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,390
Cost:
$720
$225 6,741 $65 9 - - - - $1,100 - $225
6,741
kWh
$65
9
kW-months/year
-
-
MMBtu
-
-
Tgal
$1,100
-
$
06: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,060
Cost:
-
- - $1,060 145 - - - - - - -
-
kWh
$1,060
145
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$835
Cost:
-
$490 14,361 $345 47 - - - - - - $490
14,361
kWh
$345
47
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$500
Cost:
$1,060
$500 14,654 - - - - - - - - $500
14,654
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
09: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$300
Cost:
-
$300 9,086 - - - - - - - - $300
9,086
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$31,605
Cost:
$16,740
$1,515 44,842 $6,970 953 $6,590 1,925 $15,430 4,091,295 $1,100 - $1,515
44,842
kWh
$6,970
953
kW-months/year
$6,590
1,925
MMBtu
$15,430
4,091,295
Tgal
$1,100
-
$
TOTAL IMPLEMENTED Savings:
$30,545
Cost:
$16,740
$1,515 44,842 $5,910 808 $6,590 1,925 $15,430 4,091,295 $1,100 - $1,515
44,842
kWh
$5,910
808
kW-months/year
$6,590
1,925
MMBtu
$15,430
4,091,295
Tgal
$1,100
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes