IAC Assessment: AM0412
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0412
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2002
Principal Product Industrial organic chemical processing and distilling
NAICS n/a
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 0
Annual Production 500,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,034,627 22,010,765 kWh $0.05
Electricity Demand $235,099 38,076 kW-months/year $6.17
Electricity Fees $5,880 - $ -
Natural Gas $3,598,649 896,736 MMBtu $4.01
TOTAL ENERGY COSTS $4,874,255
RECOMMENDED SAVINGS* $1,770,175 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $337,765
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ Tgal
01: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$596,000
Cost:
$117,000
- - - - - - - - - - - - $596,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$596,000
-
Tgal
02: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$536,220
Cost:
$248,400
- - - - - - - - $536,220 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$536,220
-
$
-
-
$
-
-
Tgal
03: 2.3321 USE STEAM PRESSURE REDUCTION TO GENERATE POWER Savings:
$144,000
Cost:
$600,000
$120,000 2,770,000 $24,000 3,800 - - - - - - - - - - $120,000
2,770,000
kWh
$24,000
3,800
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$140,200
Cost:
$5,100
- - - - - - - - - - $140,200 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$140,200
-
$
-
-
Tgal
05: 2.3321 USE STEAM PRESSURE REDUCTION TO GENERATE POWER Savings:
$106,000
Cost:
$140,000
$88,000 2,000,000 $18,000 2,800 - - - - - - - - - - $88,000
2,000,000
kWh
$18,000
2,800
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
06: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$104,625
Cost:
$11,800
- - - - $104,625 21,050 - - - - - - - - -
-
kWh
-
-
kW-months/year
$104,625
21,050
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$60,150
Cost:
$202,680
$43,050 1,001,610 $17,100 1,400 - - - - - - - - - - $43,050
1,001,610
kWh
$17,100
1,400
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
08: 2.2161 OPTIMIZE OPERATION OF MULTI-STAGE VACUUM STEAM JETS Savings:
$32,540
Cost:
$117,000
$(-3,340) (-77,770) $(-1,890) (-155) $17,170 3,460 - - - - - - $20,600 - $(-3,340)
(-77,770)
kWh
$(-1,890)
(-155)
kW-months/year
$17,170
3,460
MMBtu
-
-
lb
-
-
$
-
-
$
$20,600
-
Tgal
09: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$24,450
Cost:
$1,375
- - - - $24,450 4,920 - - - - - - - - -
-
kWh
-
-
kW-months/year
$24,450
4,920
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
10: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$8,430
Cost:
-
$6,030 140,235 $2,400 196 - - - - - - - - - - $6,030
140,235
kWh
$2,400
196
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,100
Cost:
$8,600
$7,100 166,000 - - - - - - - - - - - - $7,100
166,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
12: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,560
Cost:
-
- - $6,560 537 - - - - - - - - - - -
-
kWh
$6,560
537
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
13: 3.7132 REUSE RAGS UNTIL COMPLETELY SOILED Savings:
$2,120
Cost:
-
- - - - - - $2,120 1,500 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,120
1,500
lb
-
-
$
-
-
$
-
-
Tgal
14: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,000
Cost:
-
$1,000 23,460 - - - - - - - - - - - - $1,000
23,460
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
15: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$780
Cost:
-
$780 18,200 - - - - - - - - - - - - $780
18,200
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$1,770,175
Cost:
$1,451,955
$262,620 6,041,735 $66,170 8,578 $146,245 29,430 $2,120 1,500 $536,220 - $140,200 - $616,600 - $262,620
6,041,735
kWh
$66,170
8,578
kW-months/year
$146,245
29,430
MMBtu
$2,120
1,500
lb
$536,220
-
$
$140,200
-
$
$616,600
-
Tgal
TOTAL IMPLEMENTED Savings:
$337,765
Cost:
$220,955
$44,830 1,043,270 $23,660 1,937 $129,075 25,970 - - - - $140,200 - - - $44,830
1,043,270
kWh
$23,660
1,937
kW-months/year
$129,075
25,970
MMBtu
-
-
lb
-
-
$
$140,200
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption