IAC logo
IAC Assessment: AM0442
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0442
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2003
Principal Product Sealing components, gaskets
NAICS 339991 - Gasket, Packing, and Sealing Device Manufacturing
SIC 3053 - Gaskets, Packing And Sealing Devices
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 210,000
Annual Production 3,600,000 Pounds
Production Hrs. Annual 7,344
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $484,746 11,244,018 kWh $0.04
Electricity Fees $240 - $ -
Natural Gas $560,600 100,228 MMBtu $5.59
TOTAL ENERGY COSTS $1,045,586
RECOMMENDED SAVINGS* $224,850 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $224,850
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost Water Consumption
$ kWh $ MMBtu $ $ $ $ $ Tgal
01: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$101,200
Cost:
$4,800
- - $101,200 18,100 - - - - - - -
-
kWh
$101,200
18,100
MMBtu
-
-
$
-
-
$
-
-
Tgal
02: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$91,900
Cost:
$16,800
- - $40,200 7,200 - - $11,900 - $39,800 - -
-
kWh
$40,200
7,200
MMBtu
-
-
$
$11,900
-
$
$39,800
-
Tgal
03: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$12,600
Cost:
$500
- - $12,600 2,250 - - - - - - -
-
kWh
$12,600
2,250
MMBtu
-
-
$
-
-
$
-
-
Tgal
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,700
Cost:
$21
$4,700 91,700 - - - - - - - - $4,700
91,700
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
05: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$4,500
Cost:
$500
- - $4,500 800 - - - - - - -
-
kWh
$4,500
800
MMBtu
-
-
$
-
-
$
-
-
Tgal
06: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$3,600
Cost:
$1,000
- - $3,600 643 - - - - - - -
-
kWh
$3,600
643
MMBtu
-
-
$
-
-
$
-
-
Tgal
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,800
Cost:
$500
$2,800 54,800 - - - - - - - - $2,800
54,800
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,640
Cost:
$650
- - $2,640 470 - - - - - - -
-
kWh
$2,640
470
MMBtu
-
-
$
-
-
$
-
-
Tgal
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$710
Cost:
$1,200
$190 3,680 - - $380 - $140 - - - $190
3,680
kWh
-
-
MMBtu
$380
-
$
$140
-
$
-
-
Tgal
10: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$200
Cost:
$50
$200 4,000 - - - - - - - - $200
4,000
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$224,850
Cost:
$26,021
$7,890 154,180 $164,740 29,463 $380 - $12,040 - $39,800 - $7,890
154,180
kWh
$164,740
29,463
MMBtu
$380
-
$
$12,040
-
$
$39,800
-
Tgal
TOTAL IMPLEMENTED Savings:
$224,850
Cost:
$26,021
$7,890 154,180 $164,740 29,463 $380 - $12,040 - $39,800 - $7,890
154,180
kWh
$164,740
29,463
MMBtu
$380
-
$
$12,040
-
$
$39,800
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ $ $ $ $ Tgal
Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost Water Consumption