IAC Assessment: AM0488
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0488
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2005
Principal Product Skids and modules
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 191,000
Annual Production 4,474 Tons
Production Hrs. Annual 5,080
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $402,534 5,991,922 kWh $0.07
Electricity Demand $71,442 12,624 kW-months/year $5.66
Electricity Fees $2,196 - $ -
Natural Gas $7,205 712 MMBtu $10.12
TOTAL ENERGY COSTS $483,377
RECOMMENDED SAVINGS* $40,971 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,805
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 4.426 MODIFY WORKLOAD Savings:
$12,700
Cost:
$9,000
- - - - $12,700 - - - -
-
kWh
-
-
kW-months/year
$12,700
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,570
Cost:
$1,000
$6,600 108,000 $970 257 - - - - $6,600
108,000
kWh
$970
257
kW-months/year
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,850
Cost:
$13
$5,100 84,000 $750 199 - - - - $5,100
84,000
kWh
$750
199
kW-months/year
-
-
$
-
-
$
04: 4.426 MODIFY WORKLOAD Savings:
$4,200
Cost:
$15,000
- - - - - - $4,200 - -
-
kWh
-
-
kW-months/year
-
-
$
$4,200
-
$
05: 2.7145 INSTALL SKYLIGHTS Savings:
$2,215
Cost:
$10,700
$2,215 73,400 - - - - - - $2,215
73,400
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,290
Cost:
$6,576
$1,770 29,045 $520 137 - - - - $1,770
29,045
kWh
$520
137
kW-months/year
-
-
$
-
-
$
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,910
Cost:
-
$1,670 27,400 $240 65 - - - - $1,670
27,400
kWh
$240
65
kW-months/year
-
-
$
-
-
$
08: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,600
Cost:
$150
$1,350 22,100 $250 66 - - - - $1,350
22,100
kWh
$250
66
kW-months/year
-
-
$
-
-
$
09: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,500
Cost:
-
$1,500 24,800 - - - - - - $1,500
24,800
kWh
-
-
kW-months/year
-
-
$
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$930
Cost:
$460
$190 3,115 $15 4 - - $725 - $190
3,115
kWh
$15
4
kW-months/year
-
-
$
$725
-
$
11: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$206
Cost:
-
- - - - - - $206 - -
-
kWh
-
-
kW-months/year
-
-
$
$206
-
$
TOTAL RECOMMENDED Savings:
$40,971
Cost:
$42,899
$20,395 371,860 $2,745 728 $12,700 - $5,131 - $20,395
371,860
kWh
$2,745
728
kW-months/year
$12,700
-
$
$5,131
-
$
TOTAL IMPLEMENTED Savings:
$28,805
Cost:
$27,886
$13,625 260,460 $1,755 464 $12,700 - $725 - $13,625
260,460
kWh
$1,755
464
kW-months/year
$12,700
-
$
$725
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes