IAC logo
IAC Assessment: AM0508
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0508
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2006
Principal Product Bottled water and juice
NAICS 312112 - Bottled Water Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales $5,000,000-$10,000,000
# of Employees 30
Plant Area (Sq.Ft.) 33,000
Annual Production 600 Thousand Gallons
Production Hrs. Annual 1,990
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $43,994 531,734 kWh $0.08
Electricity Demand $9,153 2,900 kW-months/year $3.16
Natural Gas $7,475 777 MMBtu $9.62
TOTAL ENERGY COSTS $60,622
RECOMMENDED SAVINGS* $25,749 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ Tgal
01: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$8,400
Cost:
$2,190
- - - - - - $6,600 530 - - $1,800 - -
-
kWh
-
-
kW-months/year
-
-
$
$6,600
530
MMBtu
-
-
$
$1,800
-
Tgal
02: 4.454 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$7,024
Cost:
-
- - - - $7,024 - - - - - - - -
-
kWh
-
-
kW-months/year
$7,024
-
$
-
-
MMBtu
-
-
$
-
-
Tgal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,950
Cost:
$500
$2,410 28,060 $540 170 - - - - - - - - $2,410
28,060
kWh
$540
170
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
Tgal
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,700
Cost:
$270
$2,700 31,600 - - - - - - - - - - $2,700
31,600
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$295
Cost:
$140
$170 1,970 $37 12 - - - - $88 - - - $170
1,970
kWh
$37
12
kW-months/year
-
-
$
-
-
MMBtu
$88
-
$
-
-
Tgal
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$210
Cost:
$50
$190 2,170 $20 7 - - - - - - - - $190
2,170
kWh
$20
7
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
Tgal
07: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$190
Cost:
-
$190 2,200 - - - - - - - - - - $190
2,200
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
Tgal
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,980
Cost:
$500
- - - - - - $3,980 451 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$3,980
451
MMBtu
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$25,749
Cost:
$3,650
$5,660 66,000 $597 189 $7,024 - $10,580 981 $88 - $1,800 - $5,660
66,000
kWh
$597
189
kW-months/year
$7,024
-
$
$10,580
981
MMBtu
$88
-
$
$1,800
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Water Consumption