IAC logo
IAC Assessment: AM0517
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0517
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2006
Principal Product Vinyl composition floor tiles
NAICS 327120 - Clay Building Material and Refractories Manufacturing
SIC 3996 - Hard Surface Floor Coverings, Nec
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 432,000
Annual Production 234,000,000 Pieces
Production Hrs. Annual 7,250
Location (State) TX
View Case Study
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,795,900 36,020,375 kWh $0.08
Electricity Demand $521,497 78,840 kW-months/year $6.61
Natural Gas $1,443,660 156,888 MMBtu $9.20
TOTAL ENERGY COSTS $4,761,057
RECOMMENDED SAVINGS* $246,300 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $246,300
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$113,000
Cost:
$1,300
- - - - $113,000 12,100 - - - - -
-
kWh
-
-
kW-months/year
$113,000
12,100
MMBtu
-
-
Tgal
-
-
$
02: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$25,400
Cost:
$600
- - - - $25,400 2,720 - - - - -
-
kWh
-
-
kW-months/year
$25,400
2,720
MMBtu
-
-
Tgal
-
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$21,460
Cost:
$60,000
- - - - $21,460 2,298 - - - - -
-
kWh
-
-
kW-months/year
$21,460
2,298
MMBtu
-
-
Tgal
-
-
$
04: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$21,100
Cost:
$1,235
- - - - $21,100 2,260 - - - - -
-
kWh
-
-
kW-months/year
$21,100
2,260
MMBtu
-
-
Tgal
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,630
Cost:
-
$11,500 135,800 $1,320 250 - - - - $3,810 - $11,500
135,800
kWh
$1,320
250
kW-months/year
-
-
MMBtu
-
-
Tgal
$3,810
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$13,470
Cost:
$390
$12,150 143,000 $1,320 250 - - - - - - $12,150
143,000
kWh
$1,320
250
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
07: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$10,440
Cost:
$85
- - - - - - $10,440 1,740,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$10,440
1,740,000
Tgal
-
-
$
08: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$8,900
Cost:
-
$8,900 104,700 - - - - - - - - $8,900
104,700
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
09: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$8,100
Cost:
$500
- - - - $8,100 860 - - - - -
-
kWh
-
-
kW-months/year
$8,100
860
MMBtu
-
-
Tgal
-
-
$
10: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$7,800
Cost:
-
$7,800 91,600 - - - - - - - - $7,800
91,600
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$246,300
Cost:
$64,110
$40,350 475,100 $2,640 500 $189,060 20,238 $10,440 1,740,000 $3,810 - $40,350
475,100
kWh
$2,640
500
kW-months/year
$189,060
20,238
MMBtu
$10,440
1,740,000
Tgal
$3,810
-
$
TOTAL IMPLEMENTED Savings:
$246,300
Cost:
$64,110
$40,350 475,100 $2,640 500 $189,060 20,238 $10,440 1,740,000 $3,810 - $40,350
475,100
kWh
$2,640
500
kW-months/year
$189,060
20,238
MMBtu
$10,440
1,740,000
Tgal
$3,810
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost