Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 2008 |
Principal Product | Fiberboard |
NAICS | 321999 - All Other Miscellaneous Wood Product Manufacturing |
SIC | 2421 - Sawmills And Planing Mills, General |
Sales | $50,000,000-$100,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 196,000 |
Annual Production | 860,000 Thousand Feet |
Production Hrs. Annual | 5,520 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $6,949,481 | 102,158,615 | kWh | $0.07 |
Electricity Demand | $546,875 | 197,992 | kW-months/year | $2.76 |
Natural Gas | $5,805,456 | 1,034,939 | MMBtu | $5.61 |
Wood | $788,600 | 631,000 | MMBtu | $1.25 |
TOTAL ENERGY COSTS | $14,090,412 | |||
RECOMMENDED SAVINGS* | $2,617,220 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,414,675 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Wood | Electricity Usage | Electricity Demand | Wood | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT |
Savings: $192,300 Cost: $174,034 |
$182,000 | 2,675,000 | $10,300 | 3,720 | - | - |
$182,000 2,675,000 kWh |
$10,300 3,720 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $171,000 Cost: $5,000 |
- | - | - | - | $171,000 | 137,000 |
- - kWh |
- - kW-months/year |
$171,000 137,000 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $41,905 Cost: $105,000 |
$41,300 | 607,000 | $605 | 219 | - | - |
$41,300 607,000 kWh |
$605 219 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3411 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT |
Savings: $2,200,000 Cost: $6,600,000 |
$2,404,300 | 35,391,300 | $134,800 | 48,700 | $(-339,100) | (-271,300) |
$2,404,300 35,391,300 kWh |
$134,800 48,700 kW-months/year |
$(-339,100) (-271,300) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED |
Savings: $9,200 Cost: - |
- | - | - | - | $9,200 | 5,000 |
- - kWh |
- - kW-months/year |
$9,200 5,000 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $1,770 Cost: $1,120 |
- | - | - | - | $1,770 | 1,413 |
- - kWh |
- - kW-months/year |
$1,770 1,413 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $1,045 Cost: - |
$950 | 11,000 | $95 | 15 | - | - |
$950 11,000 kWh |
$95 15 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $2,617,220 Cost: $6,885,154 |
$2,628,550 | 38,684,300 | $145,800 | 52,654 | $(-157,130) | (-127,887) | $2,628,550 38,684,300 kWh |
$145,800 52,654 kW-months/year |
$(-157,130) (-127,887) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,414,675 Cost: $6,711,120 |
$2,445,600 | 35,998,300 | $135,405 | 48,919 | $(-166,330) | (-132,887) | $2,445,600 35,998,300 kWh |
$135,405 48,919 kW-months/year |
$(-166,330) (-132,887) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Wood | Electricity Usage | Electricity Demand | Wood |