IAC Assessment: AM0558
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0558
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2009
Principal Product metal and fiber drums
NAICS 332439 - Other Metal Container Manufacturing
SIC 3412 - Metal Barrels, Drums, And Pails
Sales $10,000,000-$50,000,000
# of Employees 112
Plant Area (Sq.Ft.) 180,000
Annual Production 2,064,000 Pieces
Production Hrs. Annual 4,000
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $455,969 5,705,697 kWh $0.08
Electricity Demand $117,825 17,037 kW-months/year $6.92
TOTAL ENERGY COSTS $573,794
RECOMMENDED SAVINGS* $83,274 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $75,174
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Water Disposal Personnel Changes Electricity Usage Electricity Demand Electricity Fees Water Disposal Personnel Changes
$ kWh $ kW-months/year $ $ $ Tgal $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$59,900
Cost:
$3,000
$48,000 565,000 $11,900 1,700 - - - - - - $48,000
565,000
kWh
$11,900
1,700
kW-months/year
-
-
$
-
-
Tgal
-
-
$
02: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$6,000
Cost:
$37,000
- - - - - - $6,000 56,700 - - -
-
kWh
-
-
kW-months/year
-
-
$
$6,000
56,700
Tgal
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,055
Cost:
-
$365 4,300 - - - - - - $4,690 - $365
4,300
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
$4,690
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,585
Cost:
-
$2,615 30,500 $970 140 - - - - - - $2,615
30,500
kWh
$970
140
kW-months/year
-
-
$
-
-
Tgal
-
-
$
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$2,100
Cost:
-
- - - - - - $2,100 9,300 - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,100
9,300
Tgal
-
-
$
06: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,565
Cost:
-
$1,180 13,900 $385 55 - - - - - - $1,180
13,900
kWh
$385
55
kW-months/year
-
-
$
-
-
Tgal
-
-
$
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$930
Cost:
$280
$730 8,600 $200 29 - - - - - - $730
8,600
kWh
$200
29
kW-months/year
-
-
$
-
-
Tgal
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$740
Cost:
$360
$170 1,960 $20 3 - - - - $550 - $170
1,960
kWh
$20
3
kW-months/year
-
-
$
-
-
Tgal
$550
-
$
09: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$865
Cost:
$500
$715 8,415 $150 21 - - - - - - $715
8,415
kWh
$150
21
kW-months/year
-
-
$
-
-
Tgal
-
-
$
10: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$2,534
Cost:
-
- - - - $2,534 - - - - - -
-
kWh
-
-
kW-months/year
$2,534
-
$
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$83,274
Cost:
$41,140
$53,775 632,675 $13,625 1,948 $2,534 - $8,100 66,000 $5,240 - $53,775
632,675
kWh
$13,625
1,948
kW-months/year
$2,534
-
$
$8,100
66,000
Tgal
$5,240
-
$
TOTAL IMPLEMENTED Savings:
$75,174
Cost:
$4,140
$53,775 632,675 $13,625 1,948 $2,534 - - - $5,240 - $53,775
632,675
kWh
$13,625
1,948
kW-months/year
$2,534
-
$
-
-
Tgal
$5,240
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ Tgal $ $
Electricity Usage Electricity Demand Electricity Fees Water Disposal Personnel Changes Electricity Usage Electricity Demand Electricity Fees Water Disposal Personnel Changes