IAC Assessment: AM0559
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0559
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2009
Principal Product Engine controllers
NAICS 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679 - Electronic Components, Nec
Sales >$500,000,000
# of Employees 900
Plant Area (Sq.Ft.) 320,000
Annual Production 1,100,000,000 Pieces
Production Hrs. Annual 7,776
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,957,312 34,254,454 kWh $0.06
Electricity Demand $348,809 54,303 kW-months/year $6.42
Electricity Fees $64,568 - $ -
Natural Gas $8,160 744 MMBtu $10.97
TOTAL ENERGY COSTS $2,378,849
RECOMMENDED SAVINGS* $130,155 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $105,655
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$79,100
Cost:
$225,000
$67,400 1,183,000 $11,700 1,825 $67,400
1,183,000
kWh
$11,700
1,825
kW-months/year
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$24,500
Cost:
-
$24,500 430,000 - - $24,500
430,000
kWh
-
-
kW-months/year
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$10,800
Cost:
$15
$9,200 161,000 $1,600 249 $9,200
161,000
kWh
$1,600
249
kW-months/year
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$7,700
Cost:
-
$7,700 135,200 - - $7,700
135,200
kWh
-
-
kW-months/year
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,810
Cost:
$500
$1,510 26,500 $300 47 $1,510
26,500
kWh
$300
47
kW-months/year
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,245
Cost:
$500
$5,320 93,400 $925 144 $5,320
93,400
kWh
$925
144
kW-months/year
TOTAL RECOMMENDED Savings:
$130,155
Cost:
$226,015
$115,630 2,029,100 $14,525 2,265 $115,630
2,029,100
kWh
$14,525
2,265
kW-months/year
TOTAL IMPLEMENTED Savings:
$105,655
Cost:
$226,015
$91,130 1,599,100 $14,525 2,265 $91,130
1,599,100
kWh
$14,525
2,265
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand