IAC logo
IAC Assessment: AM0625
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0625
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2012
Principal Product Corrugated boxes
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 68
Plant Area (Sq.Ft.) 35,000
Annual Production 144,000 Thousand Feet
Production Hrs. Annual 3,030
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $107,006 1,386,900 kWh $0.08
Electricity Demand $17,362 4,341 kW-months/year $4.00
Electricity Fees $2,250 - $ -
Natural Gas $1,284 146 MMBtu $8.79
TOTAL ENERGY COSTS $127,902
RECOMMENDED SAVINGS* $11,280 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7145 INSTALL SKYLIGHTS Savings:
$5,900
Cost:
$6,720
$5,900 70,000 - - - - - - $5,900
70,000
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,745
Cost:
$605
$300 4,000 $25 6 $1,420 - - - $300
4,000
kWh
$25
6
kW-months/year
$1,420
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,540
Cost:
$500
$1,300 15,700 $240 60 - - - - $1,300
15,700
kWh
$240
60
kW-months/year
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$730
Cost:
$425
$730 9,900 - - - - - - $730
9,900
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$600
Cost:
-
- - - - - - $600 - -
-
kWh
-
-
kW-months/year
-
-
$
$600
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$440
Cost:
-
- - $440 110 - - - - -
-
kWh
$440
110
kW-months/year
-
-
$
-
-
$
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$190
Cost:
-
$140 1,900 $50 12 - - - - $140
1,900
kWh
$50
12
kW-months/year
-
-
$
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$135
Cost:
$13
$135 1,600 - - - - - - $135
1,600
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$11,280
Cost:
$8,263
$8,505 103,100 $755 188 $1,420 - $600 - $8,505
103,100
kWh
$755
188
kW-months/year
$1,420
-
$
$600
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $