IAC logo
IAC Assessment: AM0703
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0703
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2016
Principal Product Fertilizer
NAICS 325314 - Fertilizer (Mixing Only) Manufacturing
SIC 2875 - Fertilizers, Mixing Only
Sales $100,000,000-$500,000,000
# of Employees 125
Plant Area (Sq.Ft.) 197,000
Annual Production 300,000 Tons
Production Hrs. Annual 8,736
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $320,548 5,326,845 kWh $0.06
Electricity Demand $53,235 10,898 kW-months/year $4.88
Electricity Fees $10,872 - $ -
Natural Gas $26,847 3,908 MMBtu $6.87
TOTAL ENERGY COSTS $411,502
RECOMMENDED SAVINGS* $105,010 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $60,410
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$44,600
Cost:
$52,500
$38,800 680,500 $5,800 940 $38,800
680,500
kWh
$5,800
940
kW-months/year
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$24,300
Cost:
$11,400
$24,300 425,700 - - $24,300
425,700
kWh
-
-
kW-months/year
03: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$23,300
Cost:
$66,600
$14,700 257,800 $8,600 1,400 $14,700
257,800
kWh
$8,600
1,400
kW-months/year
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,480
Cost:
$445
$4,140 72,660 $1,340 216 $4,140
72,660
kWh
$1,340
216
kW-months/year
05: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$3,830
Cost:
$1,000
- - $3,830 620 -
-
kWh
$3,830
620
kW-months/year
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,500
Cost:
$195
$3,500 61,700 - - $3,500
61,700
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$105,010
Cost:
$132,140
$85,440 1,498,360 $19,570 3,176 $85,440
1,498,360
kWh
$19,570
3,176
kW-months/year
TOTAL IMPLEMENTED Savings:
$60,410
Cost:
$79,640
$46,640 817,860 $13,770 2,236 $46,640
817,860
kWh
$13,770
2,236
kW-months/year