IAC logo
IAC Assessment: AM0812
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0812
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2020
Principal Product water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 50,000
Annual Production 1,095,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $43,716 1,182,980 kWh $0.04
Electricity Demand $18,364 2,270 kW-months/year $8.09
Electricity Fees $1,450 - $ -
TOTAL ENERGY COSTS $63,530
RECOMMENDED SAVINGS* $15,775 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,775
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$7,250
Cost:
$1,000
$7,250 196,000 - - - - - - - - $7,250
196,000
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,970
Cost:
$4,220
$2,260 61,000 $710 84 - - - - - - $2,260
61,000
kWh
$710
84
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,250
Cost:
$3,410
- - $2,250 267 - - - - - - -
-
kWh
$2,250
267
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,980
Cost:
$150
$1,220 32,900 $760 90 - - - - - - $1,220
32,900
kWh
$760
90
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$750
Cost:
$510
$750 20,200 - - - - - - - - $750
20,200
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
06: 2.4156 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM Savings:
$475
Cost:
$2,250
$555 15,000 $170 20 - - $(-810) - $560 - $555
15,000
kWh
$170
20
kW-months/year
-
-
$
$(-810)
-
$
$560
-
$
07: 2.8112 COMBINE UTILITY METERS Savings:
$100
Cost:
$17
- - - - $100 - - - - - -
-
kWh
-
-
kW-months/year
$100
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$15,775
Cost:
$11,557
$12,035 325,100 $3,890 461 $100 - $(-810) - $560 - $12,035
325,100
kWh
$3,890
461
kW-months/year
$100
-
$
$(-810)
-
$
$560
-
$
TOTAL IMPLEMENTED Savings:
$15,775
Cost:
$11,557
$12,035 325,100 $3,890 461 $100 - $(-810) - $560 - $12,035
325,100
kWh
$3,890
461
kW-months/year
$100
-
$
$(-810)
-
$
$560
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost