IAC Assessment: AM0849
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0849
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2022
Principal Product Recycled PET raw materials
NAICS 562920 - Materials Recovery Facilities
SIC 4953 - Refuse Systems
Sales $5,000,000-$10,000,000
# of Employees 13
Plant Area (Sq.Ft.) 50,000
Annual Production 22,000,000 Pounds
Production Hrs. Annual 7,437
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $71,777 1,683,832 kWh $0.04
Electricity Demand $37,402 4,000 kW-months/year $9.35
Electricity Fees $1,620 - $ -
Natural Gas $188,852 55,032 MMBtu $3.43
TOTAL ENERGY COSTS $299,651
RECOMMENDED SAVINGS* $134,871 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,333
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$9,300
Cost:
$14,300
- - $9,300 989 - - - - - - - - -
-
kWh
$9,300
989
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$1,157
Cost:
$360
- - - - - - $275 58 $882 49 - - -
-
kWh
-
-
kW-months/year
-
-
$
$275
58
MMBtu
$882
49
Tgal
-
-
$
03: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$15,440
Cost:
$21,500
$(-6,760) (-158,700) $(-2,400) (-256) - - - - - - $24,600 - $(-6,760)
(-158,700)
kWh
$(-2,400)
(-256)
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$24,600
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$18,625
Cost:
$37,000
$18,625 437,200 - - - - - - - - - - $18,625
437,200
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,395
Cost:
$1,530
$2,315 54,400 $1,080 115 - - - - - - - - $2,315
54,400
kWh
$1,080
115
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$344
Cost:
-
- - - - $344 - - - - - - - -
-
kWh
-
-
kW-months/year
$344
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$6,765
Cost:
$560
- - - - - - $6,765 1,680 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$6,765
1,680
MMBtu
-
-
Tgal
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$535
Cost:
$830
$400 9,320 $175 19 - - - - - - $(-40) - $400
9,320
kWh
$175
19
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$(-40)
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,245
Cost:
$1,000
$5,350 125,600 $1,895 203 - - - - - - - - $5,350
125,600
kWh
$1,895
203
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$362
Cost:
$30
$268 6,288 $94 10 - - - - - - - - $268
6,288
kWh
$94
10
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
11: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$71,703
Cost:
$867,640
$71,703 1,683,184 - - - - - - - - - - $71,703
1,683,184
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$134,871
Cost:
$944,750
$91,901 2,157,292 $10,144 1,080 $344 - $7,040 1,738 $882 49 $24,560 - $91,901
2,157,292
kWh
$10,144
1,080
kW-months/year
$344
-
$
$7,040
1,738
MMBtu
$882
49
Tgal
$24,560
-
$
TOTAL IMPLEMENTED Savings:
$44,333
Cost:
$54,080
$24,643 578,408 $11,464 1,221 $344 - $7,040 1,738 $882 49 $(-40) - $24,643
578,408
kWh
$11,464
1,221
kW-months/year
$344
-
$
$7,040
1,738
MMBtu
$882
49
Tgal
$(-40)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Ancillary Material Cost