IAC Assessment: AR0025
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0025
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1994
Principal Product Incandescent Light Bulbs
NAICS n/a
SIC 3641 - Electric Lamps
Sales $50,000,000-$100,000,000
# of Employees 540
Plant Area (Sq.Ft.) 550,000
Annual Production 220,000,000 Pieces
Production Hrs. Annual 6,883
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $945,021 15,303,928 kWh $0.06
Natural Gas $227,680 84,015 MMBtu $2.71
TOTAL ENERGY COSTS $1,172,701
RECOMMENDED SAVINGS* $129,126 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,161
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,649
Cost:
$300
$1,649 26,671 - - - - $1,649
26,671
kWh
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,122
Cost:
$1,456
$3,122 50,410 - - - - $3,122
50,410
kWh
-
-
MMBtu
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,184
Cost:
$725
$4,184 - - - - - $4,184
-
kWh
-
-
MMBtu
-
-
$
04: 2.4134 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE Savings:
$107,965
Cost:
$66,000
$161,229 2,611,079 $(-38,264) (-7,060) $(-15,000) - $161,229
2,611,079
kWh
$(-38,264)
(-7,060)
MMBtu
$(-15,000)
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$7,343
Cost:
$9,530
$7,343 118,992 - - - - $7,343
118,992
kWh
-
-
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,863
Cost:
$600
$4,863 78,839 - - - - $4,863
78,839
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$129,126
Cost:
$78,611
$182,390 2,885,991 $(-38,264) (-7,060) $(-15,000) - $182,390
2,885,991
kWh
$(-38,264)
(-7,060)
MMBtu
$(-15,000)
-
$
TOTAL IMPLEMENTED Savings:
$21,161
Cost:
$12,611
$21,161 274,912 - - - - $21,161
274,912
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes