IAC logo
IAC Assessment: AR0030
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0030
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1994
Principal Product Commercial Lumber
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $5,000,000-$10,000,000
# of Employees 18
Plant Area (Sq.Ft.) 10,000
Annual Production 15,000,000 Thousand Feet
Production Hrs. Annual 2,086
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $95,563 1,074,443 kWh $0.09
Natural Gas $6,700 1,356 MMBtu $4.94
TOTAL ENERGY COSTS $102,263
RECOMMENDED SAVINGS* $31,084 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,637
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,414
Cost:
$445
$1,414 15,826 - - - - $1,414
15,826
kWh
-
-
MMBtu
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$7,832
Cost:
$6,280
$7,832 87,925 - - - - $7,832
87,925
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$391
Cost:
$106
$391 4,396 - - - - $391
4,396
kWh
-
-
MMBtu
-
-
$
04: 2.4134 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE Savings:
$21,447
Cost:
$19,000
$32,976 370,750 $(-9,529) (-1,929) $(-2,000) - $32,976
370,750
kWh
$(-9,529)
(-1,929)
MMBtu
$(-2,000)
-
$
TOTAL RECOMMENDED Savings:
$31,084
Cost:
$25,831
$42,613 478,897 $(-9,529) (-1,929) $(-2,000) - $42,613
478,897
kWh
$(-9,529)
(-1,929)
MMBtu
$(-2,000)
-
$
TOTAL IMPLEMENTED Savings:
$9,637
Cost:
$6,831
$9,637 108,147 - - - - $9,637
108,147
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes