IAC logo
IAC Assessment: AR0033
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0033
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1994
Principal Product Wood Furniture
NAICS n/a
SIC 2426 - Hardwood Dimension & Flooring Mills
Sales $50,000,000-$100,000,000
# of Employees 698
Plant Area (Sq.Ft.) 200,000
Annual Production 341,500 Pieces
Production Hrs. Annual 6,257
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $605,246 15,396,249 kWh $0.04
Natural Gas $148,605 43,614 MMBtu $3.41
TOTAL ENERGY COSTS $753,851
RECOMMENDED SAVINGS* $22,229 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,229
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,144
Cost:
$750
$2,144 55,100 - - - - $2,144
55,100
kWh
-
-
MMBtu
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,939
Cost:
$8,697
$5,939 152,989 - - - - $5,939
152,989
kWh
-
-
MMBtu
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$847
Cost:
$753
$847 21,395 - - - - $847
21,395
kWh
-
-
MMBtu
-
-
$
04: 2.4134 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE Savings:
$(-5,000)
Cost:
$30,000
$27,547 715,123 $(-27,547) (-12,178) $(-5,000) - $27,547
715,123
kWh
$(-27,547)
(-12,178)
MMBtu
$(-5,000)
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,903
Cost:
$4,477
$8,903 227,433 - - - - $8,903
227,433
kWh
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,412
Cost:
$550
$6,412 165,299 - - - - $6,412
165,299
kWh
-
-
MMBtu
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,255
Cost:
$500
- - $1,255 347 - - -
-
kWh
$1,255
347
MMBtu
-
-
$
08: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,729
Cost:
$100
$1,729 41,325 - - - - $1,729
41,325
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$22,229
Cost:
$45,827
$53,521 1,378,664 $(-26,292) (-11,831) $(-5,000) - $53,521
1,378,664
kWh
$(-26,292)
(-11,831)
MMBtu
$(-5,000)
-
$
TOTAL IMPLEMENTED Savings:
$27,229
Cost:
$15,827
$25,974 663,541 $1,255 347 - - $25,974
663,541
kWh
$1,255
347
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes