IAC logo
IAC Assessment: AR0037
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0037
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1994
Principal Product Commercial Lumber Wood Paneling
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $5,000,000-$10,000,000
# of Employees 80
Plant Area (Sq.Ft.) 103,000
Annual Production 6,000 Thousand Feet
Production Hrs. Annual 2,346
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $256,870 2,676,143 kWh $0.10
TOTAL ENERGY COSTS $256,870
RECOMMENDED SAVINGS* $45,821 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $45,821
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Electricity Usage Personnel Changes
$ kWh $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$7,587
Cost:
$2,180
$7,587 79,132 - - $7,587
79,132
kWh
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,890
Cost:
$3,320
$2,890 30,188 - - $2,890
30,188
kWh
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,520
Cost:
$767
$2,520 26,377 - - $2,520
26,377
kWh
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,105
Cost:
$50
$2,105 21,981 - - $2,105
21,981
kWh
-
-
$
05: 2.3411 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT Savings:
$30,719
Cost:
$5,500
$31,719 352,579 $(-1,000) - $31,719
352,579
kWh
$(-1,000)
-
$
TOTAL RECOMMENDED Savings:
$45,821
Cost:
$11,817
$46,821 510,257 $(-1,000) - $46,821
510,257
kWh
$(-1,000)
-
$
TOTAL IMPLEMENTED Savings:
$45,821
Cost:
$11,817
$46,821 510,257 $(-1,000) - $46,821
510,257
kWh
$(-1,000)
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Personnel Changes Electricity Usage Personnel Changes