IAC logo
IAC Assessment: AR0046
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0046
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1995
Principal Product Electrical Transmission Line Equipment
NAICS n/a
SIC 3613 - Switchgear And Switchboard Apparatus
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 120,000
Annual Production 20,000,000 Pounds
Production Hrs. Annual 4,171
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $90,686 1,808,324 kWh $0.05
Natural Gas $26,575 6,274 MMBtu $4.24
TOTAL ENERGY COSTS $117,261
RECOMMENDED SAVINGS* $15,215 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,132
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,512
Cost:
$1,420
$4,512 88,218 - - $4,512
88,218
kWh
-
-
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,044
Cost:
$3,130
$1,044 20,809 - - $1,044
20,809
kWh
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,007
Cost:
$380
$4,007 80,891 - - $4,007
80,891
kWh
-
-
MMBtu
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,486
Cost:
$300
$1,486 26,377 - - $1,486
26,377
kWh
-
-
MMBtu
05: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$1,569
Cost:
$100
- - $1,569 370 -
-
kWh
$1,569
370
MMBtu
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,597
Cost:
$2,800
$4,070 81,477 $(-1,473) (-348) $4,070
81,477
kWh
$(-1,473)
(-348)
MMBtu
TOTAL RECOMMENDED Savings:
$15,215
Cost:
$8,130
$15,119 297,772 $96 22 $15,119
297,772
kWh
$96
22
MMBtu
TOTAL IMPLEMENTED Savings:
$11,132
Cost:
$5,030
$9,563 189,918 $1,569 370 $9,563
189,918
kWh
$1,569
370
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas