IAC logo
IAC Assessment: AR0062
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0062
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1995
Principal Product Steel Pipe Couplings
NAICS n/a
SIC 3498 - Fabricated Pipe And Fittings
Sales $50,000,000-$100,000,000
# of Employees 100
Plant Area (Sq.Ft.) 130,000
Annual Production 24,700,000 Pounds
Production Hrs. Annual 7,509
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $356,023 6,283,118 kWh $0.06
Natural Gas $29,284 7,578 MMBtu $3.86
TOTAL ENERGY COSTS $393,532
RECOMMENDED SAVINGS* $33,784 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,816
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Water Consumption Electricity Usage Natural Gas Water Disposal Water Consumption
$ kWh $ MMBtu $ Tgal $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$997
Cost:
$380
$997 14,947 - - - - - - $997
14,947
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$14,786
Cost:
$900
$14,786 296,600 - - - - - - $14,786
296,600
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,829
Cost:
-
$1,829 40,152 - - - - - - $1,829
40,152
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$490
Cost:
$1,000
- - $490 127 - - - - -
-
kWh
$490
127
MMBtu
-
-
Tgal
-
-
Tgal
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,615
Cost:
$300
$3,615 73,271 - - - - - - $3,615
73,271
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,364
Cost:
$400
$1,364 27,550 - - - - - - $1,364
27,550
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$8,172
Cost:
$16,900
$8,172 141,852 - - - - - - $8,172
141,852
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$968
Cost:
$400
$968 19,637 - - - - - - $968
19,637
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
09: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$420
Cost:
$100
- - $420 109 - - - - -
-
kWh
$420
109
MMBtu
-
-
Tgal
-
-
Tgal
10: 3.4151 MINIMIZE WATER USAGE Savings:
$1,143
Cost:
$100
- - - - $587 248,000 $556 - -
-
kWh
-
-
MMBtu
$587
248,000
Tgal
$556
-
Tgal
TOTAL RECOMMENDED Savings:
$33,784
Cost:
$20,480
$31,731 614,009 $910 236 $587 248,000 $556 - $31,731
614,009
kWh
$910
236
MMBtu
$587
248,000
Tgal
$556
-
Tgal
TOTAL IMPLEMENTED Savings:
$32,816
Cost:
$20,080
$30,763 594,372 $910 236 $587 248,000 $556 - $30,763
594,372
kWh
$910
236
MMBtu
$587
248,000
Tgal
$556
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal $ Tgal
Electricity Usage Natural Gas Water Disposal Water Consumption Electricity Usage Natural Gas Water Disposal Water Consumption