IAC Assessment: AR0076
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1996
Principal Product Bottled Soft Drinks
NAICS n/a
SIC 2086 - Bottled And Canned Soft Drinks
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 250,000
Annual Production 7,000,000 Pieces
Production Hrs. Annual 2,607
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $111,460 3,439,625 kWh $0.03
Electricity Demand $117,652 7,971 kW-months/year $14.76
Natural Gas $77,020 28,283 MMBtu $2.72
TOTAL ENERGY COSTS $344,191
RECOMMENDED SAVINGS* $61,542 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $42,085
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$10,799
Cost:
$2,705
$5,136 160,610 $5,663 385 - - - - - - - - $5,136
160,610
kWh
$5,663
385
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,417
Cost:
$2,610
$7,850 213,072 $5,567 378 - - - - - - - - $7,850
213,072
kWh
$5,567
378
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,150
Cost:
$130
$690 21,688 $1,460 99 - - - - - - - - $690
21,688
kWh
$1,460
99
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$780
Cost:
$50
$250 7,034 $530 36 - - - - - - - - $250
7,034
kWh
$530
36
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$707
Cost:
$160
- - - - $707 260 - - - - - - -
-
kWh
-
-
kW-months/year
$707
260
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
06: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$17,612
Cost:
$28,000
- - - - $17,612 6,448 - - - - - - -
-
kWh
-
-
kW-months/year
$17,612
6,448
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
07: 2.8112 COMBINE UTILITY METERS Savings:
$1,845
Cost:
$1,845
- - $(-2,539) - - - - - $4,384 - - - -
-
kWh
$(-2,539)
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$4,384
-
$
-
-
Tgal
08: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$620
Cost:
$140
- - - - - - $517 201,353 - - $103 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$517
201,353
Tgal
-
-
$
$103
-
Tgal
09: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$11,168
Cost:
$3,000
- - - - - - $11,168 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$11,168
-
Tgal
-
-
$
-
-
Tgal
10: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,240
Cost:
$3,440
$696 21,688 $1,544 105 - - - - - - - - $696
21,688
kWh
$1,544
105
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
11: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$204
Cost:
-
- - - - - - - - $204 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$204
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$61,542
Cost:
$42,080
$14,622 424,092 $12,225 1,003 $18,319 6,708 $11,685 201,353 $4,588 - $103 - $14,622
424,092
kWh
$12,225
1,003
kW-months/year
$18,319
6,708
MMBtu
$11,685
201,353
Tgal
$4,588
-
$
$103
-
Tgal
TOTAL IMPLEMENTED Savings:
$42,085
Cost:
$12,235
$14,622 424,092 $14,764 1,003 $707 260 $11,685 201,353 $204 - $103 - $14,622
424,092
kWh
$14,764
1,003
kW-months/year
$707
260
MMBtu
$11,685
201,353
Tgal
$204
-
$
$103
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Water Consumption