Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Arkansas |
---|---|
Assessment Year | 1996 |
Principal Product | Garage Doors |
NAICS | n/a |
SIC | 3442 - Metal Doors, Sash, And Trim |
Sales | $50,000,000-$100,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 231,000 |
Annual Production | 165,000 Pieces |
Production Hrs. Annual | 4,171 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $132,923 | 4,083,236 | kWh | $0.03 |
Electricity Demand | $163,343 | 10,124 | kW-months/year | $16.13 |
Natural Gas | $26,434 | 6,292 | MMBtu | $4.20 |
TOTAL ENERGY COSTS | $497,401 | |||
RECOMMENDED SAVINGS* | $101,197 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $19,947 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Primary Raw Material | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $10,539 Cost: $360 |
$4,388 | 133,060 | $6,151 | 383 | - | - | - | - |
$4,388 133,060 kWh |
$6,151 383 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $3,409 Cost: $200 |
$1,325 | 22,567 | $2,084 | 130 | - | - | - | - |
$1,325 22,567 kWh |
$2,084 130 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,122 Cost: $1,564 |
$1,561 | 25,791 | $1,561 | 97 | - | - | - | - |
$1,561 25,791 kWh |
$1,561 97 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $11,730 Cost: $5,680 |
$4,884 | 148,007 | $6,846 | 426 | - | - | - | - |
$4,884 148,007 kWh |
$6,846 426 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,254 Cost: - |
$633 | 19,050 | $621 | 39 | - | - | - | - |
$633 19,050 kWh |
$621 39 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $2,695 Cost: $4,110 |
$1,078 | 32,532 | $1,617 | 101 | - | - | - | - |
$1,078 32,532 kWh |
$1,617 101 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $9,408 Cost: $1,750 |
$3,995 | 121,043 | $5,413 | 337 | - | - | - | - |
$3,995 121,043 kWh |
$5,413 337 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $7,040 Cost: $1,000 |
- | - | - | - | - | - | $7,040 | - |
- - kWh |
- - kW-months/year |
- - lb |
$7,040 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $52,000 Cost: $8,000 |
- | - | - | - | $52,000 | 1,040,000 | - | - |
- - kWh |
- - kW-months/year |
$52,000 1,040,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $101,197 Cost: $22,664 |
$17,864 | 502,050 | $24,293 | 1,513 | $52,000 | 1,040,000 | $7,040 | - | $17,864 502,050 kWh |
$24,293 1,513 kW-months/year |
$52,000 1,040,000 lb |
$7,040 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $19,947 Cost: $2,110 |
$8,383 | 254,103 | $11,564 | 720 | - | - | - | - | $8,383 254,103 kWh |
$11,564 720 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Primary Raw Material | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Primary Raw Material |