IAC Assessment: AR0079
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0079
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1996
Principal Product Polystyrene Foam Trays
NAICS n/a
SIC 3086 - Plastics Foam Products
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 2,000,000
Annual Production 25,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $294,076 14,097,597 kWh $0.02
Electricity Demand $414,002 21,923 kW-months/year $18.88
Electricity Fees $1,329 - $ -
Natural Gas $34,655 8,892 MMBtu $3.90
TOTAL ENERGY COSTS $745,202
RECOMMENDED SAVINGS* $28,368 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,856
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Consumption Electricity Usage Electricity Demand Natural Gas Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$889
Cost:
$263
$366 17,585 $523 28 - - - - $366
17,585
kWh
$523
28
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,954
Cost:
$1,960
$1,096 52,169 $1,858 98 - - - - $1,096
52,169
kWh
$1,858
98
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,788
Cost:
$100
$1,247 59,203 $1,541 82 - - - - $1,247
59,203
kWh
$1,541
82
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,148
Cost:
$110
$1,414 67,116 $1,734 92 - - - - $1,414
67,116
kWh
$1,734
92
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,725
Cost:
$6,180
$2,448 116,647 $3,277 174 - - - - $2,448
116,647
kWh
$3,277
174
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$8,393
Cost:
$3,100
- - - - $8,393 2,152 - - -
-
kWh
-
-
kW-months/year
$8,393
2,152
MMBtu
-
-
Tgal
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,187
Cost:
$160
$1,187 56,565 - - - - - - $1,187
56,565
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
08: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$3,276
Cost:
$1,000
$1,468 70,047 $1,808 96 - - - - $1,468
70,047
kWh
$1,808
96
kW-months/year
-
-
MMBtu
-
-
Tgal
09: 3.4151 MINIMIZE WATER USAGE Savings:
$8
Cost:
$10
- - - - - - $8 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$8
-
Tgal
TOTAL RECOMMENDED Savings:
$28,368
Cost:
$12,883
$9,226 439,332 $10,741 570 $8,393 2,152 $8 - $9,226
439,332
kWh
$10,741
570
kW-months/year
$8,393
2,152
MMBtu
$8
-
Tgal
TOTAL IMPLEMENTED Savings:
$12,856
Cost:
$6,560
$6,296 299,531 $6,552 348 - - $8 - $6,296
299,531
kWh
$6,552
348
kW-months/year
-
-
MMBtu
$8
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Consumption Electricity Usage Electricity Demand Natural Gas Water Consumption