IAC logo
IAC Assessment: AR0082
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0082
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1996
Principal Product Table and Floor Lamps
NAICS n/a
SIC 3645 - Residential Lighting Fixtures
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 245,000
Annual Production 8,000,000 Pieces
Production Hrs. Annual 2,738
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $56,944 991,208 kWh $0.06
Electricity Demand $37,091 4,130 kW-months/year $8.98
Natural Gas $12,614 2,345 MMBtu $5.38
TOTAL ENERGY COSTS $170,773
RECOMMENDED SAVINGS* $95,020 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,228
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$5,317
Cost:
$720
$2,852 50,996 $2,465 141 - - - - $2,852
50,996
kWh
$2,465
141
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,355
Cost:
$1,976
$2,479 44,256 $1,876 194 - - - - $2,479
44,256
kWh
$1,876
194
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,725
Cost:
$140
$983 17,585 $742 77 - - - - $983
17,585
kWh
$742
77
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$549
Cost:
$100
$317 5,569 $232 24 - - - - $317
5,569
kWh
$232
24
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,633
Cost:
$100
- - - - $6,633 863 - - -
-
kWh
-
-
kW-months/year
$6,633
863
MMBtu
-
-
lb
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$709
Cost:
$1,830
$141 2,638 $568 59 - - - - $141
2,638
kWh
$568
59
kW-months/year
-
-
MMBtu
-
-
lb
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$119
Cost:
-
$57 1,172 $62 6 - - - - $57
1,172
kWh
$62
6
kW-months/year
-
-
MMBtu
-
-
lb
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$27,454
Cost:
$1,488
- - - - - - $27,454 1,488,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$27,454
1,488,000
lb
09: 3.1162 USE LESS WASTEFUL PACKAGING Savings:
$48,159
Cost:
-
- - - - - - $48,159 796,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$48,159
796,000
lb
TOTAL RECOMMENDED Savings:
$95,020
Cost:
$6,354
$6,829 122,216 $5,945 501 $6,633 863 $75,613 2,284,000 $6,829
122,216
kWh
$5,945
501
kW-months/year
$6,633
863
MMBtu
$75,613
2,284,000
lb
TOTAL IMPLEMENTED Savings:
$40,228
Cost:
$6,254
$6,829 122,216 $5,945 501 - - $27,454 1,488,000 $6,829
122,216
kWh
$5,945
501
kW-months/year
-
-
MMBtu
$27,454
1,488,000
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)