IAC Assessment: AR0083
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1996
Principal Product Die Castings
NAICS n/a
SIC 3363 - Aluminum Die-castings
Sales $10,000,000-$50,000,000
# of Employees 155
Plant Area (Sq.Ft.) 76,400
Annual Production 9,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $183,213 8,977,433 kWh $0.02
Electricity Demand $84,348 18,480 kW-months/year $4.56
Natural Gas $232,170 69,447 MMBtu $3.34
TOTAL ENERGY COSTS $504,845
RECOMMENDED SAVINGS* $18,436 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,831
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz)
$ kWh $ kW-months/year $ MMBtu $ gal
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,345
Cost:
$3,930
$1,787 89,390 $558 123 - - - - $1,787
89,390
kWh
$558
123
kW-months/year
-
-
MMBtu
-
-
gal
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,775
Cost:
$1,940
$1,985 99,355 $790 174 - - - - $1,985
99,355
kWh
$790
174
kW-months/year
-
-
MMBtu
-
-
gal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,830
Cost:
$710
$1,366 68,288 $464 102 - - - - $1,366
68,288
kWh
$464
102
kW-months/year
-
-
MMBtu
-
-
gal
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,629
Cost:
$150
$1,242 62,134 $387 85 - - - - $1,242
62,134
kWh
$387
85
kW-months/year
-
-
MMBtu
-
-
gal
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$830
Cost:
$300
$634 31,653 $196 43 - - - - $634
31,653
kWh
$196
43
kW-months/year
-
-
MMBtu
-
-
gal
06: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$4,647
Cost:
$1,000
- - - - $4,647 1,387 - - -
-
kWh
-
-
kW-months/year
$4,647
1,387
MMBtu
-
-
gal
07: 3.7311 MAINTAIN MACHINES TO REDUCE LEAKS Savings:
$4,380
Cost:
$1,000
- - - - - - $4,380 730 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,380
730
gal
TOTAL RECOMMENDED Savings:
$18,436
Cost:
$9,030
$7,014 350,820 $2,395 527 $4,647 1,387 $4,380 730 $7,014
350,820
kWh
$2,395
527
kW-months/year
$4,647
1,387
MMBtu
$4,380
730
gal
TOTAL IMPLEMENTED Savings:
$14,831
Cost:
$6,790
$4,395 219,812 $1,409 310 $4,647 1,387 $4,380 730 $4,395
219,812
kWh
$1,409
310
kW-months/year
$4,647
1,387
MMBtu
$4,380
730
gal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz)